Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 1996 |
Principal Product | Juice Products |
NAICS | n/a |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $50,000,000-$100,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 95,000 |
Annual Production | 21,000,000 Pieces |
Production Hrs. Annual | 7,200 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $420,089 | 9,322,685 | kWh | $0.05 |
Electricity Fees | $16,804 | - | $ | - |
Natural Gas | $606,568 | 144,490 | MMBtu | $4.20 |
TOTAL ENERGY COSTS | $1,058,825 | |||
RECOMMENDED SAVINGS* | $145,110 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $14,640 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $3,940 Cost: - |
- | - | - | - | $4,840 | 1,160 | - | - | $(-900) | - | - | - |
- - kWh |
- - $ |
$4,840 1,160 MMBtu |
- - Tgal |
$(-900) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,300 Cost: $900 |
$1,250 | 50,117 | $50 | - | - | - | - | - | - | - | - | - |
$1,250 50,117 kWh |
$50 - $ |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7314 REDUCE VENTILATION AIR |
Savings: $1,560 Cost: $3,000 |
$1,500 | 57,737 | $60 | - | - | - | - | - | - | - | - | - |
$1,500 57,737 kWh |
$60 - $ |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4113 TREAT AND REUSE RINSE WATERS |
Savings: $9,140 Cost: $12,000 |
- | - | - | - | - | - | $4,608 | 1,530,000 | - | - | $4,532 | - |
- - kWh |
- - $ |
- - MMBtu |
$4,608 1,530,000 Tgal |
- - $ |
$4,532 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $129,170 Cost: $160,000 |
- | - | - | - | - | - | - | - | - | - | $129,170 | - |
- - kWh |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
$129,170 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $145,110 Cost: $175,900 |
$2,750 | 107,854 | $110 | - | $4,840 | 1,160 | $4,608 | 1,530,000 | $(-900) | - | $133,702 | - | $2,750 107,854 kWh |
$110 - $ |
$4,840 1,160 MMBtu |
$4,608 1,530,000 Tgal |
$(-900) - $ |
$133,702 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $14,640 Cost: $15,000 |
$1,500 | 57,737 | $60 | - | $4,840 | 1,160 | $4,608 | 1,530,000 | $(-900) | - | $4,532 | - | $1,500 57,737 kWh |
$60 - $ |
$4,840 1,160 MMBtu |
$4,608 1,530,000 Tgal |
$(-900) - $ |
$4,532 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost |