IAC Assessment: GT0610
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0610
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1997
Principal Product Control Panels
NAICS n/a
SIC 3613 - Switchgear And Switchboard Apparatus
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 28,800
Annual Production 3,800,000 Pounds
Production Hrs. Annual 2,040
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $26,166 1,046,600 kWh $0.03
Electricity Demand $55,847 3,728 kW-months/year $14.98
Electricity Fees $4,100 - $ -
Natural Gas $8,641 1,344 MMBtu $6.43
TOTAL ENERGY COSTS $97,479
RECOMMENDED SAVINGS* $83,795 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $64,570
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ lb $ $ $ $ $ $ $ $ $ Tgal
01: 2.8112 COMBINE UTILITY METERS Savings:
$3,850
Cost:
-
- - - - - - - - - - - - - - $3,850 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$3,850
-
$
-
-
$
-
-
$
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,580
Cost:
$500
$1,332 53,341 $2,198 266 $2,050 - - - - - - - - - - - - - - - - - $1,332
53,341
kWh
$2,198
266
kW-months/year
$2,050
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
Tgal
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,319
Cost:
$510
$315 12,603 $940 63 $64 - - - - - - - - - - - - - - - - - $315
12,603
kWh
$940
63
kW-months/year
$64
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
Tgal
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$5,510
Cost:
$15,700
$621 24,912 $3,589 240 $168 - $1,132 176 - - - - - - - - - - - - - - $621
24,912
kWh
$3,589
240
kW-months/year
$168
-
$
$1,132
176
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
Tgal
05: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$13,890
Cost:
$12,000
- - - - - - - - - - $4,750 1,680 $9,140 - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$4,750
1,680
lb
$9,140
-
$
-
-
$
-
-
$
-
-
$
-
-
Tgal
06: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$45,100
Cost:
$8,000
- - - - - - - - - - - - - - - - $45,100 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
$45,100
-
$
-
-
$
-
-
Tgal
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,530
Cost:
$4,350
$1,170 46,893 - - $7 - $353 55 - - - - - - - - - - - - - - $1,170
46,893
kWh
-
-
kW-months/year
$7
-
$
$353
55
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
Tgal
08: 3.5142 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS Savings:
$7,016
Cost:
$10,120
- - - - - - - - $158 83,000 - - - - - - - - $6,748 - $110 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$158
83,000
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
$6,748
-
$
$110
-
Tgal
TOTAL RECOMMENDED Savings:
$83,795
Cost:
$51,180
$3,438 137,749 $6,727 569 $2,289 - $1,485 231 $158 83,000 $4,750 1,680 $9,140 - $3,850 - $45,100 - $6,748 - $110 - $3,438
137,749
kWh
$6,727
569
kW-months/year
$2,289
-
$
$1,485
231
MMBtu
$158
83,000
Tgal
$4,750
1,680
lb
$9,140
-
$
$3,850
-
$
$45,100
-
$
$6,748
-
$
$110
-
Tgal
TOTAL IMPLEMENTED Savings:
$64,570
Cost:
$20,500
$1,332 53,341 $2,198 266 $2,050 - - - - - $4,750 1,680 $9,140 - - - $45,100 - - - - - $1,332
53,341
kWh
$2,198
266
kW-months/year
$2,050
-
$
-
-
MMBtu
-
-
Tgal
$4,750
1,680
lb
$9,140
-
$
-
-
$
$45,100
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ lb $ $ $ $ $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Water Consumption