IAC logo
IAC Assessment: GT0621
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0621
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1997
Principal Product Agricultural Implements
NAICS n/a
SIC 3523 - Farm Machinery And Equipment
Sales $1,000,000-$5,000,000
# of Employees 25
Plant Area (Sq.Ft.) 30,000
Annual Production 5,000,000 Pounds
Production Hrs. Annual 2,080
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $96,847 1,128,664 kWh $0.09
Electricity Demand $12,398 6,394 kW-months/year $1.94
Electricity Fees $12,557 - $ -
Natural Gas $128,251 30,730 MMBtu $4.17
TOTAL ENERGY COSTS $254,853
RECOMMENDED SAVINGS* $176,339 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,360
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ gal $ $ $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,160
Cost:
$200
$983 11,430 $130 67 $47 - - - - - - - - - - - - - - - $983
11,430
kWh
$130
67
kW-months/year
$47
-
$
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
02: 4.6510 INSTALL BACK-UP EQUIPMENT Savings:
$124,259
Cost:
$82,550
- - - - - - - - $(-10,530) - - - - - - - $24,789 - $110,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$(-10,530)
-
MMBtu
-
-
gal
-
-
$
-
-
$
$24,789
-
$
$110,000
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,020
Cost:
$1,590
$869 10,258 $111 60 $40 - - - - - - - - - - - - - - - $869
10,258
kWh
$111
60
kW-months/year
$40
-
$
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.2514 COVER OPEN TANKS Savings:
$4,950
Cost:
$5,000
- - - - - - $4,950 1,186 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,950
1,186
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$38,180
Cost:
-
- - - - - - $35,480 8,509 - - - - - - $2,700 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$35,480
8,509
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
$2,700
-
$
-
-
$
-
-
$
06: 3.4155 METER WASTE WATER Savings:
$170
Cost:
-
- - - - - - - - - - - - - - - - $170 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
$170
-
$
-
-
$
07: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$6,600
Cost:
$6,600
- - - - - - - - - - $4,800 800 $1,800 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
$4,800
800
gal
$1,800
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$176,339
Cost:
$95,940
$1,852 21,688 $241 127 $87 - $40,430 9,695 $(-10,530) - $4,800 800 $1,800 - $2,700 - $24,959 - $110,000 - $1,852
21,688
kWh
$241
127
kW-months/year
$87
-
$
$40,430
9,695
MMBtu
$(-10,530)
-
MMBtu
$4,800
800
gal
$1,800
-
$
$2,700
-
$
$24,959
-
$
$110,000
-
$
TOTAL IMPLEMENTED Savings:
$40,360
Cost:
$1,790
$1,852 21,688 $241 127 $87 - $35,480 8,509 - - - - - - $2,700 - - - - - $1,852
21,688
kWh
$241
127
kW-months/year
$87
-
$
$35,480
8,509
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
$2,700
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ gal $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Other Liquid (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product