Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 1997 |
Principal Product | urethane fuel cells |
NAICS | n/a |
SIC | 3069 - Fabricated Rubber Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 400 |
Plant Area (Sq.Ft.) | 560,000 |
Annual Production | 3,800 Pieces |
Production Hrs. Annual | 4,000 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $181,858 | 7,274,326 | kWh | $0.02 |
Electricity Demand | $203,865 | 19,686 | kW-months/year | $10.36 |
Electricity Fees | $28,870 | - | $ | - |
Natural Gas | $241,075 | 71,138 | MMBtu | $3.39 |
Fuel Oil #2 | $587 | 7 | MMBtu | $83.86 |
TOTAL ENERGY COSTS | $670,148 | |||
RECOMMENDED SAVINGS* | $188,917 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $33,947 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,784 Cost: $2,500 |
$6,400 | 256,155 | $384 | - | - | - | - | - | - | - | - | - | - | - |
$6,400 256,155 kWh |
$384 - $ |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $525 Cost: $150 |
$496 | 19,930 | $29 | - | - | - | - | - | - | - | - | - | - | - |
$496 19,930 kWh |
$29 - $ |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,595 Cost: $5,050 |
$(-127) | (-4,982) | - | - | $1,722 | 508 | - | - | - | - | - | - | - | - |
$(-127) (-4,982) kWh |
- - $ |
$1,722 508 MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $402 Cost: $965 |
$402 | 13,189 | - | - | - | - | - | - | - | - | - | - | - | - |
$402 13,189 kWh |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4151 MINIMIZE WATER USAGE |
Savings: $13,141 Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | $13,141 | - |
- - kWh |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
$13,141 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $7,415 Cost: $800 |
- | - | - | - | $7,260 | 2,142 | $120 | 133,000 | - | - | - | - | $35 | - |
- - kWh |
- - $ |
$7,260 2,142 MMBtu |
$120 133,000 Tgal |
- - $ |
- - $ |
$35 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $5,680 Cost: $900 |
- | - | - | - | $6,580 | 1,940 | - | - | - | - | $(-900) | - | - | - |
- - kWh |
- - $ |
$6,580 1,940 MMBtu |
- - Tgal |
- - $ |
$(-900) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.443 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM |
Savings: $153,375 Cost: $62,650 |
$(-157,700) | (-6,308,031) | - | - | $241,075 | 71,138 | - | - | $70,000 | - | - | - | - | - |
$(-157,700) (-6,308,031) kWh |
- - $ |
$241,075 71,138 MMBtu |
- - Tgal |
$70,000 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $188,917 Cost: $73,015 |
$(-150,529) | (-6,023,739) | $413 | - | $256,637 | 75,728 | $120 | 133,000 | $70,000 | - | $(-900) | - | $13,176 | - | $(-150,529) (-6,023,739) kWh |
$413 - $ |
$256,637 75,728 MMBtu |
$120 133,000 Tgal |
$70,000 - $ |
$(-900) - $ |
$13,176 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $33,947 Cost: $5,315 |
$7,298 | 289,274 | $413 | - | $13,840 | 4,082 | $120 | 133,000 | - | - | $(-900) | - | $13,176 | - | $7,298 289,274 kWh |
$413 - $ |
$13,840 4,082 MMBtu |
$120 133,000 Tgal |
- - $ |
$(-900) - $ |
$13,176 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Personnel Changes | Administrative Changes | Ancillary Material Cost |