IAC logo
IAC Assessment: GT0656
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0656
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1998
Principal Product Sample Board/ Ring Binders
NAICS n/a
SIC 2789 - Bookbinding And Related Work
Sales $1,000,000-$5,000,000
# of Employees 42
Plant Area (Sq.Ft.) 150,000
Annual Production 400,000 Pieces
Production Hrs. Annual 4,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,200 1,516,413 kWh $0.04
Electricity Fees $4,121 - $ -
Natural Gas $13,203 2,646 MMBtu $4.99
TOTAL ENERGY COSTS $83,964
RECOMMENDED SAVINGS* $38,386 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,672
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Solid Waste (non-haz) Primary Product Electricity Usage Electricity Fees Solid Waste (non-haz) Primary Product
$ kWh $ $ $ lb $ $
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$9,632
Cost:
$7,000
$9,632 223,916 - - - - - - $9,632
223,916
kWh
-
-
$
-
-
lb
-
-
$
02: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS Savings:
$5,934
Cost:
$4,000
$5,934 138,042 - - - - - - $5,934
138,042
kWh
-
-
$
-
-
lb
-
-
$
03: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$1,440
Cost:
-
- - - - $1,440 48,000 - - -
-
kWh
-
-
$
$1,440
48,000
lb
-
-
$
04: 4.4460 AUTOMATE FINISHING PROCESS Savings:
$15,600
Cost:
$15,000
- - - - - - $15,600 - -
-
kWh
-
-
$
-
-
lb
$15,600
-
$
05: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$4,000
Cost:
$5,000
- - - - - - $4,000 - -
-
kWh
-
-
$
-
-
lb
$4,000
-
$
06: 2.8112 COMBINE UTILITY METERS Savings:
$1,780
Cost:
-
- - $1,780 - - - - - -
-
kWh
$1,780
-
$
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$38,386
Cost:
$31,000
$15,566 361,958 $1,780 - $1,440 48,000 $19,600 - $15,566
361,958
kWh
$1,780
-
$
$1,440
48,000
lb
$19,600
-
$
TOTAL IMPLEMENTED Savings:
$26,672
Cost:
$22,000
$9,632 223,916 - - $1,440 48,000 $15,600 - $9,632
223,916
kWh
-
-
$
$1,440
48,000
lb
$15,600
-
$
Savings
Cost
$ kWh $ $ $ lb $ $
Electricity Usage Electricity Fees Solid Waste (non-haz) Primary Product Electricity Usage Electricity Fees Solid Waste (non-haz) Primary Product