IAC logo
IAC Assessment: GT0668
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0668
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1999
Principal Product Fluorescent Fixtures
NAICS n/a
SIC 3351 - Copper Rolling And Drawing
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 491,900
Annual Production 2,750,000 Pieces
Production Hrs. Annual 5,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $325,322 12,232,708 kWh $0.03
Electricity Demand $251,365 20,920 kW-months/year $12.02
Electricity Fees $36,810 - $ -
Natural Gas $191,141 45,008 MMBtu $4.25
TOTAL ENERGY COSTS $827,698
RECOMMENDED SAVINGS* $1,544,954 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,455,046
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ lb $ $ $ $ $ $ $ $ $ $
01: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$3,706
Cost:
-
- - - - - - $4,606 1,084 - - - - - - $(-900) - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,606
1,084
MMBtu
-
-
gal
-
-
lb
-
-
$
$(-900)
-
$
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,660
Cost:
$1,150
$5,340 166,764 - - $320 - - - - - - - - - - - - - - - - - $5,340
166,764
kWh
-
-
kW-months/year
$320
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$23,271
Cost:
$27,500
$12,512 390,973 $10,759 893 - - - - - - - - - - - - - - - - - - $12,512
390,973
kWh
$10,759
893
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$678
Cost:
$1,000
$678 19,930 - - - - - - - - - - - - - - - - - - - - $678
19,930
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,662
Cost:
$345
$757 23,740 $812 68 $93 - - - - - - - - - - - - - - - - - $757
23,740
kWh
$812
68
kW-months/year
$93
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
06: 3.6113 REMOVE SLUDGE FROM TANKS ON A REGULAR BASIS Savings:
$48,977
Cost:
$25,000
- - - - - - - - $22,727 12,500 - - $3,750 - - - - - $22,500 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$22,727
12,500
gal
-
-
lb
$3,750
-
$
-
-
$
-
-
$
$22,500
-
$
-
-
$
07: 3.8314 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS Savings:
$12,000
Cost:
$5,000
- - - - - - - - - - $333 16,660 - - - - $11,667 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$333
16,660
lb
-
-
$
-
-
$
$11,667
-
$
-
-
$
-
-
$
08: 4.6250 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$1,449,000
Cost:
$234,000
- - - - - - - - - - - - - - - - - - - - $1,449,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
$1,449,000
-
$
TOTAL RECOMMENDED Savings:
$1,544,954
Cost:
$293,995
$19,287 601,407 $11,571 961 $413 - $4,606 1,084 $22,727 12,500 $333 16,660 $3,750 - $(-900) - $11,667 - $22,500 - $1,449,000 - $19,287
601,407
kWh
$11,571
961
kW-months/year
$413
-
$
$4,606
1,084
MMBtu
$22,727
12,500
gal
$333
16,660
lb
$3,750
-
$
$(-900)
-
$
$11,667
-
$
$22,500
-
$
$1,449,000
-
$
TOTAL IMPLEMENTED Savings:
$1,455,046
Cost:
$235,345
$1,435 43,670 $812 68 $93 - $4,606 1,084 - - - - - - $(-900) - - - - - $1,449,000 - $1,435
43,670
kWh
$812
68
kW-months/year
$93
-
$
$4,606
1,084
MMBtu
-
-
gal
-
-
lb
-
-
$
$(-900)
-
$
-
-
$
-
-
$
$1,449,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ lb $ $ $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product