IAC logo
IAC Assessment: GT0678
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0678
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1999
Principal Product Recreational Vehicles
NAICS n/a
SIC 3799 - Transportation Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 900
Plant Area (Sq.Ft.) 365,000
Annual Production 9,600 Pieces
Production Hrs. Annual 4,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $600,786 19,921,454 kWh $0.03
Electricity Demand $256,771 19,162 kW-months/year $13.40
Electricity Fees $51,450 - $ -
Natural Gas $377,914 73,327 MMBtu $5.15
LPG $36,521 8,504 MMBtu $4.29
TOTAL ENERGY COSTS $1,359,422
RECOMMENDED SAVINGS* $112,297 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,905
#|Description Savings
Cost
Status Electricity Usage Natural Gas LPG Water Disposal Other Liquid (haz) Ancillary Material Cost Electricity Usage Natural Gas LPG Water Disposal Other Liquid (haz) Ancillary Material Cost
$ kWh $ MMBtu $ MMBtu $ Tgal $ gal $ $
01: 3.4155 METER WASTE WATER Savings:
$4,925
Cost:
$900
- - - - - - $4,925 1,728,000 - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$4,925
1,728,000
Tgal
-
-
gal
-
-
$
02: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$920
Cost:
$900
- - $920 291 - - - - - - - - -
-
kWh
$920
291
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,880
Cost:
$3,500
$4,880 139,508 - - - - - - - - - - $4,880
139,508
kWh
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,400
Cost:
-
$5,400 154,162 - - - - - - - - - - $5,400
154,162
kWh
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$8,447
Cost:
$21,000
- - $(-23,548) (-7,452) $31,995 6,750 - - - - - - -
-
kWh
$(-23,548)
(-7,452)
MMBtu
$31,995
6,750
MMBtu
-
-
Tgal
-
-
gal
-
-
$
06: 3.5142 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS Savings:
$35,980
Cost:
-
- - - - - - - - $35,980 21,600 - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$35,980
21,600
gal
-
-
$
07: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$44,185
Cost:
$120,000
$8,317 237,691 $35,868 11,351 - - - - - - - - $8,317
237,691
kWh
$35,868
11,351
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
08: 2.8112 COMBINE UTILITY METERS Savings:
$7,560
Cost:
$7,500
- - - - - - - - - - $7,560 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
gal
$7,560
-
$
TOTAL RECOMMENDED Savings:
$112,297
Cost:
$153,800
$18,597 531,361 $13,240 4,190 $31,995 6,750 $4,925 1,728,000 $35,980 21,600 $7,560 - $18,597
531,361
kWh
$13,240
4,190
MMBtu
$31,995
6,750
MMBtu
$4,925
1,728,000
Tgal
$35,980
21,600
gal
$7,560
-
$
TOTAL IMPLEMENTED Savings:
$40,905
Cost:
$900
- - - - - - $4,925 1,728,000 $35,980 21,600 - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$4,925
1,728,000
Tgal
$35,980
21,600
gal
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ Tgal $ gal $ $
Electricity Usage Natural Gas LPG Water Disposal Other Liquid (haz) Ancillary Material Cost Electricity Usage Natural Gas LPG Water Disposal Other Liquid (haz) Ancillary Material Cost