Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 1999 |
Principal Product | Recreational Vehicles |
NAICS | n/a |
SIC | 3799 - Transportation Equipment, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 900 |
Plant Area (Sq.Ft.) | 365,000 |
Annual Production | 9,600 Pieces |
Production Hrs. Annual | 4,000 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $600,786 | 19,921,454 | kWh | $0.03 |
Electricity Demand | $256,771 | 19,162 | kW-months/year | $13.40 |
Electricity Fees | $51,450 | - | $ | - |
Natural Gas | $377,914 | 73,327 | MMBtu | $5.15 |
LPG | $36,521 | 8,504 | MMBtu | $4.29 |
TOTAL ENERGY COSTS | $1,359,422 | |||
RECOMMENDED SAVINGS* | $112,297 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $40,905 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | LPG | Water Disposal | Other Liquid (haz) | Ancillary Material Cost | Electricity Usage | Natural Gas | LPG | Water Disposal | Other Liquid (haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4155 METER WASTE WATER |
Savings: $4,925 Cost: $900 |
- | - | - | - | - | - | $4,925 | 1,728,000 | - | - | - | - |
- - kWh |
- - MMBtu |
- - MMBtu |
$4,925 1,728,000 Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN |
Savings: $920 Cost: $900 |
- | - | $920 | 291 | - | - | - | - | - | - | - | - |
- - kWh |
$920 291 MMBtu |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $4,880 Cost: $3,500 |
$4,880 | 139,508 | - | - | - | - | - | - | - | - | - | - |
$4,880 139,508 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,400 Cost: - |
$5,400 | 154,162 | - | - | - | - | - | - | - | - | - | - |
$5,400 154,162 kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $8,447 Cost: $21,000 |
- | - | $(-23,548) | (-7,452) | $31,995 | 6,750 | - | - | - | - | - | - |
- - kWh |
$(-23,548) (-7,452) MMBtu |
$31,995 6,750 MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5142 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS |
Savings: $35,980 Cost: - |
- | - | - | - | - | - | - | - | $35,980 | 21,600 | - | - |
- - kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
$35,980 21,600 gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR |
Savings: $44,185 Cost: $120,000 |
$8,317 | 237,691 | $35,868 | 11,351 | - | - | - | - | - | - | - | - |
$8,317 237,691 kWh |
$35,868 11,351 MMBtu |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.8112 COMBINE UTILITY METERS |
Savings: $7,560 Cost: $7,500 |
- | - | - | - | - | - | - | - | - | - | $7,560 | - |
- - kWh |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - gal |
$7,560 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $112,297 Cost: $153,800 |
$18,597 | 531,361 | $13,240 | 4,190 | $31,995 | 6,750 | $4,925 | 1,728,000 | $35,980 | 21,600 | $7,560 | - | $18,597 531,361 kWh |
$13,240 4,190 MMBtu |
$31,995 6,750 MMBtu |
$4,925 1,728,000 Tgal |
$35,980 21,600 gal |
$7,560 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $40,905 Cost: $900 |
- | - | - | - | - | - | $4,925 | 1,728,000 | $35,980 | 21,600 | - | - | - - kWh |
- - MMBtu |
- - MMBtu |
$4,925 1,728,000 Tgal |
$35,980 21,600 gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | LPG | Water Disposal | Other Liquid (haz) | Ancillary Material Cost | Electricity Usage | Natural Gas | LPG | Water Disposal | Other Liquid (haz) | Ancillary Material Cost |