IAC Assessment: GT0695
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2000
Principal Product Cotton Mats / Wool Rugs
NAICS n/a
SIC 2273 - Carpets And Rugs
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 50,000
Annual Production 1,800,000 Pieces
Production Hrs. Annual 2,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $32,917 483,880 kWh $0.07
Electricity Demand $7,819 2,553 kW-months/year $3.06
Electricity Fees $6,514 - $ -
Natural Gas $50,969 6,848 MMBtu $7.44
TOTAL ENERGY COSTS $111,973
RECOMMENDED SAVINGS* $46,790 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kW-months/year $ $ $ MMBtu $ lb $ $ $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,267
Cost:
-
- - - - - - - - - - $2,267 - - - -
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
$2,267
-
$
-
-
$
02: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$3,232
Cost:
$900
- - - - $742 83 - - $2,490 - - - - - -
-
kW-months/year
-
-
$
$742
83
MMBtu
-
-
lb
$2,490
-
$
-
-
$
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$700
Cost:
$450
- - - - $700 78 - - - - - - - - -
-
kW-months/year
-
-
$
$700
78
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$888
Cost:
-
$838 19 $50 - - - - - - - - - - - $838
19
kW-months/year
$50
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$14,296
Cost:
$28,000
- - - - $14,296 1,505 - - - - - - - - -
-
kW-months/year
-
-
$
$14,296
1,505
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$6,035
Cost:
$10,000
- - - - - - $6,035 8,700 - - - - - - -
-
kW-months/year
-
-
$
-
-
MMBtu
$6,035
8,700
lb
-
-
$
-
-
$
-
-
$
07: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$1,980
Cost:
$1,000
- - - - - - - - - - - - $1,980 - -
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$1,980
-
$
08: 2.8112 COMBINE UTILITY METERS Savings:
$15,392
Cost:
-
- - - - - - - - - - $15,392 - - - -
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
$15,392
-
$
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,000
Cost:
$5,400
- - - - $2,000 224 - - - - - - - - -
-
kW-months/year
-
-
$
$2,000
224
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$46,790
Cost:
$45,750
$838 19 $50 - $17,738 1,890 $6,035 8,700 $2,490 - $17,659 - $1,980 - $838
19
kW-months/year
$50
-
$
$17,738
1,890
MMBtu
$6,035
8,700
lb
$2,490
-
$
$17,659
-
$
$1,980
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kW-months/year $ $ $ MMBtu $ lb $ $ $ $ $ $
Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost