IAC logo
IAC Assessment: GT0699
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0699
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2000
Principal Product Poultry
NAICS n/a
SIC 2015 - Poultry Slaughtering And Processing
Sales $50,000,000-$100,000,000
# of Employees 420
Plant Area (Sq.Ft.) 250,000
Annual Production 27,000,000 Pieces
Production Hrs. Annual 2,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $587,649 9,033,119 kWh $0.07
Electricity Demand $105,464 19,337 kW-months/year $5.45
Electricity Fees $86,083 - $ -
LPG $825,000 138,000 MMBtu $5.98
TOTAL ENERGY COSTS $1,604,196
RECOMMENDED SAVINGS* $352,413 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees LPG Personnel Changes Electricity Usage Electricity Demand Electricity Fees LPG Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 4.452 ELIMINATE SHIFT Savings:
$244,498
Cost:
-
$448 9,672 - - - - $28,050 4,690 $216,000 - $448
9,672
kWh
-
-
kW-months/year
-
-
$
$28,050
4,690
MMBtu
$216,000
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$20,694
Cost:
-
$15,235 347,304 $4,284 785 $1,175 - - - - - $15,235
347,304
kWh
$4,284
785
kW-months/year
$1,175
-
$
-
-
MMBtu
-
-
$
03: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$37,855
Cost:
-
- - - - - - $37,855 6,332 - - -
-
kWh
-
-
kW-months/year
-
-
$
$37,855
6,332
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$8,198
Cost:
$1,000
- - - - - - $8,198 1,455 - - -
-
kWh
-
-
kW-months/year
-
-
$
$8,198
1,455
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,763
Cost:
$3,000
- - - - - - $5,763 949 - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,763
949
MMBtu
-
-
$
06: 3.4151 MINIMIZE WATER USAGE Savings:
$680
Cost:
$600
$680 14,654 - - - - - - - - $680
14,654
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$883
Cost:
$9,000
$833 19,050 - - $50 - - - - - $833
19,050
kWh
-
-
kW-months/year
$50
-
$
-
-
MMBtu
-
-
$
08: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$505
Cost:
$900
$476 10,844 - - $29 - - - - - $476
10,844
kWh
-
-
kW-months/year
$29
-
$
-
-
MMBtu
-
-
$
09: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$11,182
Cost:
$31,500
$421 9,086 - - - - $10,761 1,800 - - $421
9,086
kWh
-
-
kW-months/year
-
-
$
$10,761
1,800
MMBtu
-
-
$
10: 2.8112 COMBINE UTILITY METERS Savings:
$21,948
Cost:
-
- - - - $21,948 - - - - - -
-
kWh
-
-
kW-months/year
$21,948
-
$
-
-
MMBtu
-
-
$
11: 3.4151 MINIMIZE WATER USAGE Savings:
$207
Cost:
$205
$207 4,689 - - - - - - - - $207
4,689
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$352,413
Cost:
$46,205
$18,300 415,299 $4,284 785 $23,202 - $90,627 15,226 $216,000 - $18,300
415,299
kWh
$4,284
785
kW-months/year
$23,202
-
$
$90,627
15,226
MMBtu
$216,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees LPG Personnel Changes Electricity Usage Electricity Demand Electricity Fees LPG Personnel Changes