IAC logo
IAC Assessment: GT0719
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0719
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2001
Principal Product Glass Bottles
NAICS n/a
SIC 3221 - Glass Containers
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 184,000
Annual Production 122,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $313,069 17,519,226 kWh $0.02
Electricity Demand $219,425 29,616 kW-months/year $7.41
Electricity Fees $108,747 - $ -
Natural Gas $790,503 157,495 MMBtu $5.02
TOTAL ENERGY COSTS $1,479,085
RECOMMENDED SAVINGS* $176,552 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost Water Consumption Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost Water Consumption Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $ $ Tgal $ $
01: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$80,000
Cost:
$125,000
$(-400) (-22,380) - - $(-30) - $84,340 16,800 - - $(-3,910) - - - - - $(-400)
(-22,380)
kWh
-
-
kW-months/year
$(-30)
-
$
$84,340
16,800
MMBtu
-
-
Tgal
$(-3,910)
-
$
-
-
Tgal
-
-
$
02: 4.1230 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING Savings:
$18,750
Cost:
$1,500
- - - - - - - - - - - - - - $18,750 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
$18,750
-
$
03: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$44,105
Cost:
$12,500
$(-675) (-37,800) - - - - - - $24,028 9,928,800 $(-1,300) - $22,052 - - - $(-675)
(-37,800)
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$24,028
9,928,800
Tgal
$(-1,300)
-
$
$22,052
-
Tgal
-
-
$
04: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$30,490
Cost:
$8,220
- - - - - - - - $30,490 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$30,490
-
Tgal
-
-
$
-
-
Tgal
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$467
Cost:
$400
$437 24,446 - - $30 - - - - - - - - - - - $437
24,446
kWh
-
-
kW-months/year
$30
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,740
Cost:
$900
$2,204 123,331 $356 48 $180 - - - - - - - - - - - $2,204
123,331
kWh
$356
48
kW-months/year
$180
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$176,552
Cost:
$148,520
$1,566 87,597 $356 48 $180 - $84,340 16,800 $54,518 9,928,800 $(-5,210) - $22,052 - $18,750 - $1,566
87,597
kWh
$356
48
kW-months/year
$180
-
$
$84,340
16,800
MMBtu
$54,518
9,928,800
Tgal
$(-5,210)
-
$
$22,052
-
Tgal
$18,750
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $ $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost Water Consumption Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Ancillary Material Cost Water Consumption Primary Product