IAC logo
IAC Assessment: GT0721
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0721
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2001
Principal Product Printed Folding Cartons
NAICS n/a
SIC 2657 - Folding Paperboard Boxes
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 300,000
Annual Production 56,400,000 Pieces
Production Hrs. Annual 8,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $306,184 13,578,023 kWh $0.02
Electricity Demand $317,538 26,295 kW-months/year $12.08
Electricity Fees $69,023 - $ -
Natural Gas $119,556 9,924 MMBtu $12.05
TOTAL ENERGY COSTS $812,301
RECOMMENDED SAVINGS* $912,215 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Fees Natural Gas Personnel Changes Administrative Changes
$ kWh $ $ $ MMBtu $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$12,360
Cost:
$5,050
$(-286) (-11,444) $(-19) - $12,665 1,490 - - - - $(-286)
(-11,444)
kWh
$(-19)
-
$
$12,665
1,490
MMBtu
-
-
$
-
-
$
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$25,375
Cost:
-
- - - - - - - - $25,375 - -
-
kWh
-
-
$
-
-
MMBtu
-
-
$
$25,375
-
$
03: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$38,845
Cost:
$80,000
$(-2,605) (-104,195) $(-183) - $41,633 4,898 - - - - $(-2,605)
(-104,195)
kWh
$(-183)
-
$
$41,633
4,898
MMBtu
-
-
$
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$705
Cost:
$60
- - - - $705 83 - - - - -
-
kWh
-
-
$
$705
83
MMBtu
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$28,530
Cost:
$15,000
$26,664 938,888 $1,866 - - - - - - - $26,664
938,888
kWh
$1,866
-
$
-
-
MMBtu
-
-
$
-
-
$
06: 4.446 AUTOMATE FINISHING PROCESS Savings:
$806,400
Cost:
$3,500,000
- - - - - - $806,400 - - - -
-
kWh
-
-
$
-
-
MMBtu
$806,400
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$912,215
Cost:
$3,600,110
$23,773 823,249 $1,664 - $55,003 6,471 $806,400 - $25,375 - $23,773
823,249
kWh
$1,664
-
$
$55,003
6,471
MMBtu
$806,400
-
$
$25,375
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Fees Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Fees Natural Gas Personnel Changes Administrative Changes