IAC logo
IAC Assessment: GT0740
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0740
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2002
Principal Product Bearings
NAICS n/a
SIC 3562 - Ball And Roller Bearings
Sales $50,000,000-$100,000,000
# of Employees 460
Plant Area (Sq.Ft.) 265,000
Annual Production 100,000,000 Pieces
Production Hrs. Annual 6,900
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $542,970 24,652,800 kWh $0.02
Electricity Demand $606,107 3,845 kW-months/year $157.64
Electricity Fees $113,645 - $ -
Natural Gas $326,438 63,520 MMBtu $5.14
Fuel Oil #2 $15,121 2,342 MMBtu $6.46
TOTAL ENERGY COSTS $1,649,944
RECOMMENDED SAVINGS* $242,959 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,601
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,545
Cost:
-
$1,545 70,086 - - - - - - - - - - $1,545
70,086
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$33,056
Cost:
$2,500
$9,334 323,480 $9,722 37 - - - - $9,000 - $5,000 - $9,334
323,480
kWh
$9,722
37
kW-months/year
-
-
MMBtu
-
-
Tgal
$9,000
-
$
$5,000
-
$
03: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$62,171
Cost:
$130,800
$24,782 1,124,417 $45,009 281 $(-7,620) (-2,177) - - - - - - $24,782
1,124,417
kWh
$45,009
281
kW-months/year
$(-7,620)
(-2,177)
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,365
Cost:
-
- - - - $1,365 390 - - - - - - -
-
kWh
-
-
kW-months/year
$1,365
390
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$3,122
Cost:
$1,000
$1,463 66,400 $2,659 17 $(-1,000) (-200) - - - - - - $1,463
66,400
kWh
$2,659
17
kW-months/year
$(-1,000)
(-200)
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 4.446 AUTOMATE FINISHING PROCESS Savings:
$130,680
Cost:
$10,300
- - - - - - - - $130,680 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$130,680
-
$
-
-
$
07: 3.4151 MINIMIZE WATER USAGE Savings:
$11,020
Cost:
$21,250
- - - - - - $11,020 4,300,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$11,020
4,300,000
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$242,959
Cost:
$165,850
$37,124 1,584,383 $57,390 335 $(-7,255) (-1,987) $11,020 4,300,000 $139,680 - $5,000 - $37,124
1,584,383
kWh
$57,390
335
kW-months/year
$(-7,255)
(-1,987)
MMBtu
$11,020
4,300,000
Tgal
$139,680
-
$
$5,000
-
$
TOTAL IMPLEMENTED Savings:
$34,601
Cost:
$2,500
$10,879 393,566 $9,722 37 - - - - $9,000 - $5,000 - $10,879
393,566
kWh
$9,722
37
kW-months/year
-
-
MMBtu
-
-
Tgal
$9,000
-
$
$5,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost