Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2006
Principal Product Fragrance Ingredients
NAICS 325620 - Toilet Preparation Manufacturing
SIC 2844 - Toilet Preparations
Sales $50,000,000-$100,000,000
# of Employees 60
Plant Area (Sq.Ft.) 873,000
Annual Production 12,000 Tons
Production Hrs. Annual 8,760
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $554,986 12,739,491 kWh $0.04
Electricity Demand $65,907 7,555 kW-months/year $8.72
Natural Gas $1,403,994 180,893 MMBtu $7.76
TOTAL ENERGY COSTS $2,024,887
RECOMMENDED SAVINGS* $232,117 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Primary Product Electricity Usage Electricity Fees Natural Gas Primary Product
$ kWh $ $ $ MMBtu $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$204,303
Cost:
-
- - - - $209,439 26,990 $(-5,136) - -
-
kWh
-
-
$
$209,439
26,990
MMBtu
$(-5,136)
-
$
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$15,359
Cost:
$12,000
$15,359 292,000 - - - - - - $15,359
292,000
kWh
-
-
$
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,732
Cost:
$1,390
$1,732 32,924 - - - - - - $1,732
32,924
kWh
-
-
$
-
-
MMBtu
-
-
$
04: 2.2696 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS Savings:
$4,073
Cost:
$10,200
$4,073 77,438 - - - - - - $4,073
77,438
kWh
-
-
$
-
-
MMBtu
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$6,650
Cost:
$5,952
- - $6,650 - - - - - -
-
kWh
$6,650
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$232,117
Cost:
$29,542
$21,164 402,362 $6,650 - $209,439 26,990 $(-5,136) - $21,164
402,362
kWh
$6,650
-
$
$209,439
26,990
MMBtu
$(-5,136)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ $
Electricity Usage Electricity Fees Natural Gas Primary Product Electricity Usage Electricity Fees Natural Gas Primary Product