IAC logo
IAC Assessment: GT0822
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0822
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2006
Principal Product Nylon & Polypropylene yarn
NAICS 325220 - Artificial and Synthetic Fibers and Filaments Manufacturing
SIC 2824 - Organic Fibers, Noncellulosic
Sales $100,000,000-$500,000,000
# of Employees 367
Plant Area (Sq.Ft.) 398,184
Annual Production 64,000 Tons
Production Hrs. Annual 8,760
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,975,396 90,163,524 kWh $0.03
Electricity Demand $229,177 149,760 kW-months/year $1.53
Natural Gas $17,312 1,364 MMBtu $12.69
TOTAL ENERGY COSTS $3,221,885
RECOMMENDED SAVINGS* $645,301 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $570,623
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Water Consumption Primary Product Electricity Usage Electricity Demand Water Disposal Water Consumption Primary Product
$ kWh $ kW-months/year $ Tgal $ Tgal $ $
01: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$22,995
Cost:
$640
- - - - $16,203 9,702,576 $6,792 - - - -
-
kWh
-
-
kW-months/year
$16,203
9,702,576
Tgal
$6,792
-
Tgal
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,292
Cost:
$10,800
$3,292 99,757 - - - - - - - - $3,292
99,757
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$97,628
Cost:
$18,865
$97,628 2,958,411 - - - - - - - - $97,628
2,958,411
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,620
Cost:
$850
$6,620 200,626 - - - - - - - - $6,620
200,626
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
05: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$60,069
Cost:
$87,937
$53,342 1,616,464 $6,727 2,220 - - - - - - $53,342
1,616,464
kWh
$6,727
2,220
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
06: 2.8112 COMBINE UTILITY METERS Savings:
$4,697
Cost:
-
- - $4,697 - - - - - - - -
-
kWh
$4,697
-
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
07: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$450,000
Cost:
$20,000
- - - - - - - - $450,000 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
$450,000
-
$
TOTAL RECOMMENDED Savings:
$645,301
Cost:
$139,092
$160,882 4,875,258 $11,424 2,220 $16,203 9,702,576 $6,792 - $450,000 - $160,882
4,875,258
kWh
$11,424
2,220
kW-months/year
$16,203
9,702,576
Tgal
$6,792
-
Tgal
$450,000
-
$
TOTAL IMPLEMENTED Savings:
$570,623
Cost:
$39,505
$97,628 2,958,411 - - $16,203 9,702,576 $6,792 - $450,000 - $97,628
2,958,411
kWh
-
-
kW-months/year
$16,203
9,702,576
Tgal
$6,792
-
Tgal
$450,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Water Consumption Primary Product Electricity Usage Electricity Demand Water Disposal Water Consumption Primary Product