Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2007 |
Principal Product | Towels |
NAICS | 313210 - Broadwoven Fabric Mills |
SIC | 2211 - Broadwoven Fabric Mills, Cotton |
Sales | $10,000,000-$50,000,000 |
# of Employees | 192 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 5,600,000 Pounds |
Production Hrs. Annual | 7,056 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $243,377 | 5,753,600 | kWh | $0.04 |
Electricity Demand | $145,274 | 13,862 | kW-months/year | $10.48 |
Electricity Fees | $28,067 | - | $ | - |
Natural Gas | $733,837 | 85,027 | MMBtu | $8.63 |
TOTAL ENERGY COSTS | $1,150,555 | |||
RECOMMENDED SAVINGS* | $191,680 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $75,550 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Ancillary Material Cost | Electricity Usage | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $5,980 Cost: $1,603 |
- | - | $5,980 | 693 | - | - |
- - kWh |
$5,980 693 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.5111 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS |
Savings: $17,400 Cost: $27,000 |
- | - | $17,400 | 2,020 | - | - |
- - kWh |
$17,400 2,020 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $14,060 Cost: $26,800 |
- | - | $14,060 | 1,630 | - | - |
- - kWh |
$14,060 1,630 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $76,200 Cost: $20,000 |
- | - | $76,200 | 8,830 | - | - |
- - kWh |
$76,200 8,830 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $4,090 Cost: $3,900 |
$4,090 | 90,250 | - | - | - | - |
$4,090 90,250 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.8131 USE WATER-BASED ADHESIVES |
Savings: $1,960 Cost: - |
- | - | $3,920 | 454 | $(-1,960) | - |
- - kWh |
$3,920 454 MMBtu |
$(-1,960) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2711 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING |
Savings: $63,520 Cost: $7,000 |
- | - | $63,520 | 7,360 | - | - |
- - kWh |
$63,520 7,360 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $8,470 Cost: $11,100 |
$8,470 | 187,155 | - | - | - | - |
$8,470 187,155 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $191,680 Cost: $97,403 |
$12,560 | 277,405 | $181,080 | 20,987 | $(-1,960) | - | $12,560 277,405 kWh |
$181,080 20,987 MMBtu |
$(-1,960) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $75,550 Cost: $12,503 |
$4,090 | 90,250 | $73,420 | 8,507 | $(-1,960) | - | $4,090 90,250 kWh |
$73,420 8,507 MMBtu |
$(-1,960) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Ancillary Material Cost | Electricity Usage | Natural Gas | Ancillary Material Cost |