Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2008 |
Principal Product | Aluminum Extrusion |
NAICS | 331318 - Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3354 - Aluminum Extruded Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 85 |
Plant Area (Sq.Ft.) | 144,600 |
Annual Production | 24,000,000 Pieces |
Production Hrs. Annual | 4,680 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $313,331 | 6,454,469 | kWh | $0.05 |
Electricity Demand | $129,170 | 8,023 | kW-months/year | $16.10 |
Natural Gas | $356,515 | 38,908 | MMBtu | $9.16 |
TOTAL ENERGY COSTS | $799,016 | |||
RECOMMENDED SAVINGS* | $202,360 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,146 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Primary Raw Material | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $11,250 Cost: $19,500 |
- | - | - | - | - | - | $11,250 | 1,264 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$11,250 1,264 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT |
Savings: $180,800 Cost: $541,073 |
$131,962 | 2,639,250 | - | - | $2,370 | - | $(-73,532) | (-8,262) | $120,000 | - |
$131,962 2,639,250 kWh |
- - kW-months/year |
$2,370 - $ |
$(-73,532) (-8,262) MMBtu |
$120,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $340 Cost: $1,000 |
$340 | 6,642 | - | - | - | - | - | - | - | - |
$340 6,642 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,718 Cost: $3,250 |
$3,717 | 74,350 | $1 | 191 | - | - | - | - | - | - |
$3,717 74,350 kWh |
$1 191 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,088 Cost: - |
$2,087 | 41,743 | $1 | 107 | - | - | - | - | - | - |
$2,087 41,743 kWh |
$1 107 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,164 Cost: $10,000 |
$4,163 | 83,267 | $1 | 214 | - | - | - | - | - | - |
$4,163 83,267 kWh |
$1 214 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $202,360 Cost: $574,823 |
$142,269 | 2,845,252 | $3 | 512 | $2,370 | - | $(-62,282) | (-6,998) | $120,000 | - | $142,269 2,845,252 kWh |
$3 512 kW-months/year |
$2,370 - $ |
$(-62,282) (-6,998) MMBtu |
$120,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,146 Cost: $4,250 |
$6,144 | 122,735 | $2 | 298 | - | - | - | - | - | - | $6,144 122,735 kWh |
$2 298 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Primary Raw Material | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Primary Raw Material |