IAC Assessment: GT0848
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0848
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2008
Principal Product Aluminum Extrusion
NAICS 331318 - Other Aluminum Rolling, Drawing, and Extruding
SIC 3354 - Aluminum Extruded Products
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 144,600
Annual Production 24,000,000 Pieces
Production Hrs. Annual 4,680
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $313,331 6,454,469 kWh $0.05
Electricity Demand $129,170 8,023 kW-months/year $16.10
Natural Gas $356,515 38,908 MMBtu $9.16
TOTAL ENERGY COSTS $799,016
RECOMMENDED SAVINGS* $202,360 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,146
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Raw Material
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$11,250
Cost:
$19,500
- - - - - - $11,250 1,264 - - -
-
kWh
-
-
kW-months/year
-
-
$
$11,250
1,264
MMBtu
-
-
$
02: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT Savings:
$180,800
Cost:
$541,073
$131,962 2,639,250 - - $2,370 - $(-73,532) (-8,262) $120,000 - $131,962
2,639,250
kWh
-
-
kW-months/year
$2,370
-
$
$(-73,532)
(-8,262)
MMBtu
$120,000
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$340
Cost:
$1,000
$340 6,642 - - - - - - - - $340
6,642
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,718
Cost:
$3,250
$3,717 74,350 $1 191 - - - - - - $3,717
74,350
kWh
$1
191
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,088
Cost:
-
$2,087 41,743 $1 107 - - - - - - $2,087
41,743
kWh
$1
107
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,164
Cost:
$10,000
$4,163 83,267 $1 214 - - - - - - $4,163
83,267
kWh
$1
214
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$202,360
Cost:
$574,823
$142,269 2,845,252 $3 512 $2,370 - $(-62,282) (-6,998) $120,000 - $142,269
2,845,252
kWh
$3
512
kW-months/year
$2,370
-
$
$(-62,282)
(-6,998)
MMBtu
$120,000
-
$
TOTAL IMPLEMENTED Savings:
$6,146
Cost:
$4,250
$6,144 122,735 $2 298 - - - - - - $6,144
122,735
kWh
$2
298
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Raw Material