IAC logo
IAC Assessment: GT0863
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0863
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2009
Principal Product Airfoils
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $100,000,000-$500,000,000
# of Employees 700
Plant Area (Sq.Ft.) 170,000
Annual Production 3,200,000 Pounds
Production Hrs. Annual 8,424
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,031,671 24,563,588 kWh $0.04
Electricity Demand $457,702 39,974 kW-months/year $11.45
Electricity Fees $1,073 - $ -
Natural Gas $2,006,474 117,276 MMBtu $17.11
TOTAL ENERGY COSTS $3,496,920
RECOMMENDED SAVINGS* $646,936 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$3,847
Cost:
$500
- - - - $3,847 367 - - -
-
kWh
-
-
kW-months/year
$3,847
367
MMBtu
-
-
$
02: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$24,150
Cost:
-
- - - - - - $24,150 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$24,150
-
$
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$194,835
Cost:
$180,000
$131,164 3,122,945 $63,671 5,561 - - - - $131,164
3,122,945
kWh
$63,671
5,561
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$316,142
Cost:
$180,000
- - - - $316,142 30,109 - - -
-
kWh
-
-
kW-months/year
$316,142
30,109
MMBtu
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$107,962
Cost:
$125,000
- - - - $107,962 10,282 - - -
-
kWh
-
-
kW-months/year
$107,962
10,282
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$646,936
Cost:
$485,500
$131,164 3,122,945 $63,671 5,561 $427,951 40,758 $24,150 - $131,164
3,122,945
kWh
$63,671
5,561
kW-months/year
$427,951
40,758
MMBtu
$24,150
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes