Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2010 |
Principal Product | Commercial carpet |
NAICS | 314110 - Carpet and Rug Mills |
SIC | 2273 - Carpets And Rugs |
Sales | $50,000,000-$100,000,000 |
# of Employees | 384 |
Plant Area (Sq.Ft.) | 441,230 |
Annual Production | 84,920,720 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $369,138 | 8,768,000 | kWh | $0.04 |
Electricity Demand | $306,311 | 27,393 | kW-months/year | $11.18 |
Natural Gas | $345,701 | 55,749 | MMBtu | $6.20 |
TOTAL ENERGY COSTS | $1,021,150 | |||
RECOMMENDED SAVINGS* | $128,876 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $113,539 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,786 Cost: $1,500 |
$4,966 | 170,820 | $3,820 | 342 | - | - | - | - |
$4,966 170,820 kWh |
$3,820 342 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.2111 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE |
Savings: $307 Cost: $50 |
$201 | 6,927 | $106 | 9 | - | - | - | - |
$201 6,927 kWh |
$106 9 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $4,989 Cost: $10,500 |
$2,820 | 97,020 | $2,169 | 194 | - | - | - | - |
$2,820 97,020 kWh |
$2,169 194 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $1,027 Cost: $300 |
- | - | - | - | $1,027 | 166 | - | - |
- - kWh |
- - kW-months/year |
$1,027 166 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2211 USE OPTIMUM TEMPERATURE |
Savings: $103,726 Cost: $187,530 |
- | - | - | - | $103,726 | 16,730 | - | - |
- - kWh |
- - kW-months/year |
$103,726 16,730 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $10,041 Cost: $20,000 |
- | - | - | - | - | - | $10,041 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$10,041 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $128,876 Cost: $219,880 |
$7,987 | 274,767 | $6,095 | 545 | $104,753 | 16,896 | $10,041 | - | $7,987 274,767 kWh |
$6,095 545 kW-months/year |
$104,753 16,896 MMBtu |
$10,041 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $113,539 Cost: $189,330 |
$4,966 | 170,820 | $3,820 | 342 | $104,753 | 16,896 | - | - | $4,966 170,820 kWh |
$3,820 342 kW-months/year |
$104,753 16,896 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption |