Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2011 |
Principal Product | Sausages |
NAICS | 311612 - Meat Processed from Carcasses |
SIC | 2013 - Sausages And Other Prepared Meats |
Sales | $100,000,000-$500,000,000 |
# of Employees | 230 |
Plant Area (Sq.Ft.) | 97,000 |
Annual Production | 1,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $516,706 | 8,626,146 | kWh | $0.06 |
Electricity Demand | $305,003 | 19,489 | kW-months/year | $15.65 |
Electricity Fees | $19,791 | - | $ | - |
Natural Gas | $229,015 | 37,978 | MMBtu | $6.03 |
TOTAL ENERGY COSTS | $1,070,515 | |||
RECOMMENDED SAVINGS* | $208,568 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $149,800 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,831 Cost: $1,250 |
$2,353 | 39,287 | $1,478 | 94 | - | - |
$2,353 39,287 kWh |
$1,478 94 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $13,152 Cost: - |
$9,537 | 159,210 | $3,615 | 231 | - | - |
$9,537 159,210 kWh |
$3,615 231 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,390 Cost: $244 |
- | - | - | - | $1,390 | 230 |
- - kWh |
- - kW-months/year |
$1,390 230 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $75,872 Cost: $100,115 |
$66,482 | 1,109,891 | $9,390 | 600 | - | - |
$66,482 1,109,891 kWh |
$9,390 600 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2694 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE |
Savings: $70,097 Cost: $17,000 |
$45,495 | 759,510 | $24,602 | 1,572 | - | - |
$45,495 759,510 kWh |
$24,602 1,572 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $18,994 Cost: $5,000 |
$13,988 | 233,518 | $5,006 | 320 | - | - |
$13,988 233,518 kWh |
$5,006 320 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $25,232 Cost: $38,000 |
$25,232 | 421,240 | - | - | - | - |
$25,232 421,240 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $208,568 Cost: $161,609 |
$163,087 | 2,722,656 | $44,091 | 2,817 | $1,390 | 230 | $163,087 2,722,656 kWh |
$44,091 2,817 kW-months/year |
$1,390 230 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $149,800 Cost: $118,365 |
$114,330 | 1,908,688 | $35,470 | 2,266 | - | - | $114,330 1,908,688 kWh |
$35,470 2,266 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |