IAC logo
IAC Assessment: GT0886
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0886
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2011
Principal Product Multi-wall bags
NAICS 322220 - Paper Bag and Coated and Treated Paper Manufacturing
SIC 2674 - Bags: Uncoated Paper & Multiwall
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 300,000
Annual Production 24,000 Tons
Production Hrs. Annual 8,568
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $298,190 5,324,822 kWh $0.06
Electricity Demand $169,213 10,716 kW-months/year $15.79
Electricity Fees $29,400 - $ -
Natural Gas $91,242 9,041 MMBtu $10.09
TOTAL ENERGY COSTS $596,981
RECOMMENDED SAVINGS* $115,217 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $85,057
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Administrative Changes Electricity Usage Electricity Demand Water Disposal Administrative Changes
$ kWh $ kW-months/year $ Tgal $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$30,160
Cost:
$2,400
- - - - - - $30,160 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$30,160
-
$
02: 3.4155 METER WASTE WATER Savings:
$5,529
Cost:
$2,500
- - - - $5,529 2,373,000 - - -
-
kWh
-
-
kW-months/year
$5,529
2,373,000
Tgal
-
-
$
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,617
Cost:
$9,994
$1,826 31,110 $1,791 93 - - - - $1,826
31,110
kWh
$1,791
93
kW-months/year
-
-
Tgal
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$51,129
Cost:
$25,000
$34,072 580,440 $17,057 890 - - - - $34,072
580,440
kWh
$17,057
890
kW-months/year
-
-
Tgal
-
-
$
05: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$24,782
Cost:
$14,000
$13,888 236,590 $10,894 569 - - - - $13,888
236,590
kWh
$10,894
569
kW-months/year
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$115,217
Cost:
$53,894
$49,786 848,140 $29,742 1,553 $5,529 2,373,000 $30,160 - $49,786
848,140
kWh
$29,742
1,553
kW-months/year
$5,529
2,373,000
Tgal
$30,160
-
$
TOTAL IMPLEMENTED Savings:
$85,057
Cost:
$51,494
$49,786 848,140 $29,742 1,553 $5,529 2,373,000 - - $49,786
848,140
kWh
$29,742
1,553
kW-months/year
$5,529
2,373,000
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Administrative Changes Electricity Usage Electricity Demand Water Disposal Administrative Changes