IAC Assessment: GT0889
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0889
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2012
Principal Product Woven Textile Sheeting and Blankets
NAICS 313310 - Textile and Fabric Finishing Mills
SIC 2261 - Finishing Plants, Cotton
Sales >$500,000,000
# of Employees 45
Plant Area (Sq.Ft.) 109,010
Annual Production 75,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $230,640 4,659,400 kWh $0.05
Electricity Demand $45,469 12,991 kW-months/year $3.50
Natural Gas $634,394 103,537 MMBtu $6.13
TOTAL ENERGY COSTS $910,503
RECOMMENDED SAVINGS* $67,642 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,925
Cost:
$1,000
- - - - $3,925 655 - - - - -
-
kWh
-
-
kW-months/year
$3,925
655
MMBtu
-
-
$
-
-
Tgal
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$14,795
Cost:
$8,500
- - - - $14,795 2,470 - - - - -
-
kWh
-
-
kW-months/year
$14,795
2,470
MMBtu
-
-
$
-
-
Tgal
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,743
Cost:
$3,920
- - - - $4,743 792 - - - - -
-
kWh
-
-
kW-months/year
$4,743
792
MMBtu
-
-
$
-
-
Tgal
04: 2.2162 REDUCE EXCESS STEAM BLEEDING Savings:
$19,253
Cost:
$45,075
- - - - $11,639 1,943 $2,229 - $5,385 - -
-
kWh
-
-
kW-months/year
$11,639
1,943
MMBtu
$2,229
-
$
$5,385
-
Tgal
05: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$24,926
Cost:
$6,000
$309 (-6,240) $(-42) (-12) - - - - $24,659 - $309
(-6,240)
kWh
$(-42)
(-12)
kW-months/year
-
-
MMBtu
-
-
$
$24,659
-
Tgal
TOTAL RECOMMENDED Savings:
$67,642
Cost:
$64,495
$309 (-6,240) $(-42) (-12) $35,102 5,860 $2,229 - $30,044 - $309
(-6,240)
kWh
$(-42)
(-12)
kW-months/year
$35,102
5,860
MMBtu
$2,229
-
$
$30,044
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Water Consumption