IAC logo
IAC Assessment: GT0899
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0899
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2017
Principal Product Canned tuna
NAICS 311710 - Seafood Product Preparation and Packaging
SIC 2091 - Canned And Cured Fish And Seafoods
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 200,000
Annual Production 6,360,000 Units
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,073,891 13,734,551 kWh $0.08
Natural Gas $410,915 110,532 MMBtu $3.72
TOTAL ENERGY COSTS $1,484,806
RECOMMENDED SAVINGS* $400,469 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,167
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Usage Electricity Usage Natural Gas Water Usage
$ kWh $ MMBtu $ Tgal
01: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$108,707
Cost:
$1,008
$8,602 110,282 $100,105 26,910 - - $8,602
110,282
kWh
$100,105
26,910
MMBtu
-
-
Tgal
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$7,187
Cost:
$1,000
$7,187 92,135 - - - - $7,187
92,135
kWh
-
-
MMBtu
-
-
Tgal
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$29,097
Cost:
$4,967
$29,097 373,033 - - - - $29,097
373,033
kWh
-
-
MMBtu
-
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$40,882
Cost:
$10,400
$40,882 524,130 - - - - $40,882
524,130
kWh
-
-
MMBtu
-
-
Tgal
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$8,883
Cost:
$9,708
$8,883 113,880 - - - - $8,883
113,880
kWh
-
-
MMBtu
-
-
Tgal
06: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$205,713
Cost:
$445,437
- - - - $205,713 66,568 -
-
kWh
-
-
MMBtu
$205,713
66,568
Tgal
TOTAL RECOMMENDED Savings:
$400,469
Cost:
$472,520
$94,651 1,213,460 $100,105 26,910 $205,713 66,568 $94,651
1,213,460
kWh
$100,105
26,910
MMBtu
$205,713
66,568
Tgal
TOTAL IMPLEMENTED Savings:
$45,167
Cost:
$15,675
$45,167 579,048 - - - - $45,167
579,048
kWh
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Usage Electricity Usage Natural Gas Water Usage