Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2017 |
Principal Product | Canned Protein |
NAICS | 311991 - Perishable Prepared Food Manufacturing |
SIC | 2099 - Food Preparations, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 500 |
Plant Area (Sq.Ft.) | 2,000 |
Annual Production | 143,000,000 Units |
Production Hrs. Annual | 8,760 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,033,762 | 28,426,827 | kWh | $0.07 |
Natural Gas | $930,511 | 240,802 | MMBtu | $3.86 |
TOTAL ENERGY COSTS | $2,964,273 | |||
RECOMMENDED SAVINGS* | $134,150 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $78,019 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $5,412 Cost: $125 |
$5,412 | 75,172 | - | - |
$5,412 75,172 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $3,577 Cost: $578 |
$3,577 | 50,003 | - | - |
$3,577 50,003 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2223 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF |
Savings: $25,748 Cost: $19,769 |
- | - | $25,748 | 6,671 |
- - kWh |
$25,748 6,671 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4145 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE |
Savings: $30,382 Cost: $47,492 |
$30,382 | 421,978 | - | - |
$30,382 421,978 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $24,538 Cost: $61,313 |
$24,538 | 340,809 | - | - |
$24,538 340,809 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $44,491 Cost: $135,000 |
$44,491 | 823,916 | - | - |
$44,491 823,916 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $134,150 Cost: $264,277 |
$108,401 | 1,711,878 | $25,748 | 6,671 | $108,401 1,711,878 kWh |
$25,748 6,671 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $78,019 Cost: $197,016 |
$78,019 | 1,289,900 | - | - | $78,019 1,289,900 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |