IAC Assessment: GT0922
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0922
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2019
Principal Product Calcium Carbonate Products
NAICS 327991 - Cut Stone and Stone Product Manufacturing
SIC 3281 - Cut Stone And Stone Products
Sales $50,000,000-$100,000,000
# of Employees 107
Plant Area (Sq.Ft.) 1,000,000
Annual Production 533,515 Units
Production Hrs. Annual 8,736
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,234,154 30,627,121 kWh $0.07
Natural Gas $104,050 28,108 MMBtu $3.70
TOTAL ENERGY COSTS $2,338,204
RECOMMENDED SAVINGS* $101,078 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $101,078
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.4313 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT Savings:
$8,082
Cost:
$1,200
$8,082 110,707 - - - - $8,082
110,707
kWh
-
-
$
-
-
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,827
Cost:
$1,175
- - - - $6,827 1,845 -
-
kWh
-
-
$
$6,827
1,845
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,604
Cost:
$3,500
$9,604 131,564 - - - - $9,604
131,564
kWh
-
-
$
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$76,284
Cost:
$79,761
$76,284 1,044,988 - - - - $76,284
1,044,988
kWh
-
-
$
-
-
MMBtu
05: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$281
Cost:
$1,190
- - $281 - - - -
-
kWh
$281
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$101,078
Cost:
$86,826
$93,970 1,287,259 $281 - $6,827 1,845 $93,970
1,287,259
kWh
$281
-
$
$6,827
1,845
MMBtu
TOTAL IMPLEMENTED Savings:
$101,078
Cost:
$86,826
$93,970 1,287,259 $281 - $6,827 1,845 $93,970
1,287,259
kWh
$281
-
$
$6,827
1,845
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas