IAC logo
IAC Assessment: GT0932
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0932
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2019
Principal Product Bedding/Sheeting Textiles
NAICS 313310 - Textile and Fabric Finishing Mills
SIC 2221 - Broadwoven Fabric Mills, Manmade
Sales $1,000,000-$5,000,000
# of Employees 12
Plant Area (Sq.Ft.) 125,000
Annual Production 12,000 Thousand Feet
Production Hrs. Annual 2,496
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,579 685,824 kWh $0.11
Natural Gas $124,613 23,915 MMBtu $5.21
TOTAL ENERGY COSTS $201,192
RECOMMENDED SAVINGS* $19,466 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,181
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,019
Cost:
$500
$2,019 18,357 - - $2,019
18,357
kWh
-
-
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$495
Cost:
$382
- - $495 95 -
-
kWh
$495
95
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,606
Cost:
$1,689
$1,606 14,602 - - $1,606
14,602
kWh
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,768
Cost:
$5,877
- - $4,768 915 -
-
kWh
$4,768
915
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$899
Cost:
$1,117
$899 8,174 - - $899
8,174
kWh
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,678
Cost:
$14,251
$9,678 87,986 - - $9,678
87,986
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$19,466
Cost:
$23,816
$14,203 129,118 $5,263 1,010 $14,203
129,118
kWh
$5,263
1,010
MMBtu
TOTAL IMPLEMENTED Savings:
$8,181
Cost:
$7,876
$2,918 26,531 $5,263 1,010 $2,918
26,531
kWh
$5,263
1,010
MMBtu
Savings
Cost
$ kWh $ MMBtu