Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2021 |
Principal Product | Cans and Bottles of Soft Drinks |
NAICS | 312111 - Soft Drink Manufacturing |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $50,000,000-$100,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 400,000 |
Annual Production | 25,767,985 Units |
Production Hrs. Annual | 6,900 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,581,034 | 14,442,494 | kWh | $0.11 |
Natural Gas | $211,457 | 48,630 | MMBtu | $4.35 |
TOTAL ENERGY COSTS | $1,792,491 | |||
RECOMMENDED SAVINGS* | $631,294 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $110,715 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Personnel Changes | Electricity Usage | Electricity Fees | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $93,972 Cost: $800 |
- | - | $93,972 | - | - | - |
- - kWh |
$93,972 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $16,743 Cost: $1,850 |
$19,643 | 180,210 | - | - | $(-2,900) | - |
$19,643 180,210 kWh |
- - $ |
$(-2,900) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $151,488 Cost: $44,117 |
$151,488 | 1,389,798 | - | - | - | - |
$151,488 1,389,798 kWh |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $326 Cost: $200 |
$326 | 2,994 | - | - | - | - |
$326 2,994 kWh |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $368,765 Cost: $3,913,242 |
$368,765 | 3,368,613 | - | - | - | - |
$368,765 3,368,613 kWh |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $631,294 Cost: $3,960,209 |
$540,222 | 4,941,615 | $93,972 | - | $(-2,900) | - | $540,222 4,941,615 kWh |
$93,972 - $ |
$(-2,900) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $110,715 Cost: $2,650 |
$19,643 | 180,210 | $93,972 | - | $(-2,900) | - | $19,643 180,210 kWh |
$93,972 - $ |
$(-2,900) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Personnel Changes | Electricity Usage | Electricity Fees | Personnel Changes |