Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2023 |
Principal Product | Fresh Loaf Breads and Buns |
NAICS | 311812 - Commercial Bakeries |
SIC | 2051 - Bread, Cake, And Related Products |
Sales | $100,000,000-$500,000,000 |
# of Employees | 225 |
Plant Area (Sq.Ft.) | 164,000 |
Annual Production | 562,441,165 Pounds |
Production Hrs. Annual | 7,280 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $761,691 | 9,050,134 | kWh | $0.08 |
Natural Gas | $476,328 | 64,712 | MMBtu | $7.36 |
TOTAL ENERGY COSTS | $1,238,019 | |||
RECOMMENDED SAVINGS* | $264,618 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $96,955 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $78,169 Cost: $1,850 |
$81,069 | 965,110 | - | - | - | - | $(-2,900) | - | - | - |
$81,069 965,110 kWh |
- - $ |
- - MMBtu |
$(-2,900) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $142,026 Cost: $175,000 |
$61,152 | 728,000 | - | - | $(-19,126) | (-2,599) | - | - | $100,000 | - |
$61,152 728,000 kWh |
- - $ |
$(-19,126) (-2,599) MMBtu |
- - $ |
$100,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $23,849 Cost: $36,015 |
$23,849 | 283,920 | - | - | - | - | - | - | - | - |
$23,849 283,920 kWh |
- - $ |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $18,786 Cost: $50,570 |
$10,786 | 128,400 | - | - | - | - | $8,000 | - | - | - |
$10,786 128,400 kWh |
- - $ |
- - MMBtu |
$8,000 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $1,788 Cost: $8,500 |
- | - | $1,788 | - | - | - | - | - | - | - |
- - kWh |
$1,788 - $ |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $264,618 Cost: $271,935 |
$176,856 | 2,105,430 | $1,788 | - | $(-19,126) | (-2,599) | $5,100 | - | $100,000 | - | $176,856 2,105,430 kWh |
$1,788 - $ |
$(-19,126) (-2,599) MMBtu |
$5,100 - $ |
$100,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $96,955 Cost: $52,420 |
$91,855 | 1,093,510 | - | - | - | - | $5,100 | - | - | - | $91,855 1,093,510 kWh |
- - $ |
- - MMBtu |
$5,100 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost |