IAC logo
IAC Assessment: GT0964
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0964
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2023
Principal Product Fresh Loaf Breads and Buns
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $100,000,000-$500,000,000
# of Employees 225
Plant Area (Sq.Ft.) 164,000
Annual Production 562,441,165 Pounds
Production Hrs. Annual 7,280
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $761,691 9,050,134 kWh $0.08
Natural Gas $476,328 64,712 MMBtu $7.36
TOTAL ENERGY COSTS $1,238,019
RECOMMENDED SAVINGS* $264,618 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $96,955
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ $ $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$78,169
Cost:
$1,850
$81,069 965,110 - - - - $(-2,900) - - - $81,069
965,110
kWh
-
-
$
-
-
MMBtu
$(-2,900)
-
$
-
-
$
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$142,026
Cost:
$175,000
$61,152 728,000 - - $(-19,126) (-2,599) - - $100,000 - $61,152
728,000
kWh
-
-
$
$(-19,126)
(-2,599)
MMBtu
-
-
$
$100,000
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$23,849
Cost:
$36,015
$23,849 283,920 - - - - - - - - $23,849
283,920
kWh
-
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$18,786
Cost:
$50,570
$10,786 128,400 - - - - $8,000 - - - $10,786
128,400
kWh
-
-
$
-
-
MMBtu
$8,000
-
$
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,788
Cost:
$8,500
- - $1,788 - - - - - - - -
-
kWh
$1,788
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$264,618
Cost:
$271,935
$176,856 2,105,430 $1,788 - $(-19,126) (-2,599) $5,100 - $100,000 - $176,856
2,105,430
kWh
$1,788
-
$
$(-19,126)
(-2,599)
MMBtu
$5,100
-
$
$100,000
-
$
TOTAL IMPLEMENTED Savings:
$96,955
Cost:
$52,420
$91,855 1,093,510 - - - - $5,100 - - - $91,855
1,093,510
kWh
-
-
$
-
-
MMBtu
$5,100
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost