IAC logo
IAC Assessment: GT0973
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0973
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2024
Principal Product Printing Inks and Coatings
NAICS 325910 - Printing Ink Manufacturing
SIC 2893 - Printing Ink
Sales $10,000,000-$50,000,000
# of Employees 22
Plant Area (Sq.Ft.) 52,500
Annual Production 10,661,211 Pounds
Production Hrs. Annual 2,500
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,827 481,200 kWh $0.16
Natural Gas $46,628 3,422 MMBtu $13.63
TOTAL ENERGY COSTS $123,455
RECOMMENDED SAVINGS* $63,950 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,930
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Fees Natural Gas Personnel Changes
$ kWh $ $ $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$7,645
Cost:
$800
- - $7,645 - - - - - -
-
kWh
$7,645
-
$
-
-
MMBtu
-
-
$
02: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$394
Cost:
$90
$394 2,465 - - - - - - $394
2,465
kWh
-
-
$
-
-
MMBtu
-
-
$
03: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$689
Cost:
$200
- - $689 - - - - - -
-
kWh
$689
-
$
-
-
MMBtu
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$305
Cost:
$200
$305 1,906 - - - - - - $305
1,906
kWh
-
-
$
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,586
Cost:
$1,850
$4,486 28,035 - - - - $(-2,900) - $4,486
28,035
kWh
-
-
$
-
-
MMBtu
$(-2,900)
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$25,481
Cost:
$338,242
$25,481 159,597 - - - - - - $25,481
159,597
kWh
-
-
$
-
-
MMBtu
-
-
$
07: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$27,850
Cost:
$175,000
$40,000 250,000 - - $(-12,150) (-891) - - $40,000
250,000
kWh
-
-
$
$(-12,150)
(-891)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$63,950
Cost:
$516,382
$70,666 442,003 $8,334 - $(-12,150) (-891) $(-2,900) - $70,666
442,003
kWh
$8,334
-
$
$(-12,150)
(-891)
MMBtu
$(-2,900)
-
$
TOTAL IMPLEMENTED Savings:
$9,930
Cost:
$2,940
$5,185 32,406 $7,645 - - - $(-2,900) - $5,185
32,406
kWh
$7,645
-
$
-
-
MMBtu
$(-2,900)
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ $
Electricity Usage Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Fees Natural Gas Personnel Changes