IAC logo
IAC Assessment: GT0979
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0979
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 2024
Principal Product Foam Mattresses
NAICS 337910 - Mattress Manufacturing
SIC 2515 - Mattresses And Bedsprings
Sales $10,000,000-$50,000,000
# of Employees 114
Plant Area (Sq.Ft.) 1,000,000
Annual Production 540,000 Units
Production Hrs. Annual 2,340
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $311,677 5,133,876 kWh $0.06
Electricity Fees $23,279 - $ -
Natural Gas $100,904 5,882 MMBtu $17.15
Other Gas $7,475 1 MMBtu $7,474.53
TOTAL ENERGY COSTS $443,335
RECOMMENDED SAVINGS* $165,744 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Administrative Changes Electricity Usage Electricity Fees Administrative Changes
$ kWh $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$12,666
Cost:
$200
- - - - $12,666 - -
-
kWh
-
-
$
$12,666
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$26,554
Cost:
$800
- - $26,554 - - - -
-
kWh
$26,554
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,807
Cost:
$1,850
$20,707 339,456 - - $(-2,900) - $20,707
339,456
kWh
-
-
$
$(-2,900)
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,122
Cost:
$800
$3,122 51,177 - - - - $3,122
51,177
kWh
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$148
Cost:
$100
$148 2,431 - - - - $148
2,431
kWh
-
-
$
-
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$105,447
Cost:
$2,259,869
$105,447 1,736,903 - - - - $105,447
1,736,903
kWh
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$165,744
Cost:
$2,263,619
$129,424 2,129,967 $26,554 - $9,766 - $129,424
2,129,967
kWh
$26,554
-
$
$9,766
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Electricity Fees Administrative Changes Electricity Usage Electricity Fees Administrative Changes