Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2025 |
Principal Product | Lead-Acid Batteries |
NAICS | 335911 - Storage Battery Manufacturing |
SIC | 3694 - Engine Electrical Equipment |
Sales | $100,000,000-$500,000,000 |
# of Employees | 268 |
Plant Area (Sq.Ft.) | 159,000 |
Annual Production | 2,104,536 Units |
Production Hrs. Annual | 8,760 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,090,753 | 34,648,613 | kWh | $0.06 |
Electricity Fees | $10,998 | - | $ | - |
Natural Gas | $223,859 | 29,280 | MMBtu | $7.65 |
Other Gas | $14,344 | 1 | MMBtu | $14,344.00 |
TOTAL ENERGY COSTS | $2,339,954 | |||
RECOMMENDED SAVINGS* | $141,982 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Other Gas | Personnel Changes | Electricity Usage | Electricity Fees | Other Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $14,344 Cost: $800 |
- | - | - | - | $14,344 | 1 | - | - |
- - kWh |
- - $ |
$14,344 1 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE |
Savings: $5,947 Cost: $400 |
$5,947 | 99,122 | - | - | - | - | - | - |
$5,947 99,122 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $18,172 Cost: $1,850 |
$21,072 | 351,202 | - | - | - | - | $(-2,900) | - |
$21,072 351,202 kWh |
- - $ |
- - MMBtu |
$(-2,900) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $598 Cost: $200 |
$598 | 9,965 | - | - | - | - | - | - |
$598 9,965 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $10,998 Cost: $47,093 |
- | - | $10,998 | - | - | - | - | - |
- - kWh |
$10,998 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $91,923 Cost: $962,674 |
$91,923 | 1,523,379 | - | - | - | - | - | - |
$91,923 1,523,379 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $141,982 Cost: $1,013,017 |
$119,540 | 1,983,668 | $10,998 | - | $14,344 | 1 | $(-2,900) | - | $119,540 1,983,668 kWh |
$10,998 - $ |
$14,344 1 MMBtu |
$(-2,900) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Other Gas | Personnel Changes | Electricity Usage | Electricity Fees | Other Gas | Personnel Changes |