IAC logo
IAC Assessment: HO0226
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0226
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 2000
Principal Product Cut-up Poultry
NAICS n/a
SIC 2015 - Poultry Slaughtering And Processing
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 75,000
Annual Production 53,000,000 Pounds
Production Hrs. Annual 2,210
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $178,085 4,282,239 kWh $0.04
Electricity Demand $112,670 11,798 kW-months/year $9.55
LPG $3,803 5,112 MMBtu $0.74
Fuel Oil #2 $149,243 42,547 MMBtu $3.51
TOTAL ENERGY COSTS $443,801
RECOMMENDED SAVINGS* $40,146 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,230
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Water Disposal One-time Revenue or Avoided Cost Electricity Usage Fuel Oil #2 Water Disposal One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ Tgal $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$281
Cost:
$1,500
$281 6,741 - - - - - - $281
6,741
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$7,450
Cost:
$400
- - $7,450 2,122 - - - - -
-
kWh
$7,450
2,122
MMBtu
-
-
Tgal
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,224
Cost:
$4,350
- - $2,224 634 - - - - -
-
kWh
$2,224
634
MMBtu
-
-
Tgal
-
-
$
04: 3.7121 IMPROVE HANDLING PRACTICES Savings:
$3,900
Cost:
$4,000
- - - - - - $3,900 - -
-
kWh
-
-
MMBtu
-
-
Tgal
$3,900
-
$
05: 4.425 ELIMINATE/REDUCE REDUNDANT INSPECTIONS Savings:
$3,900
Cost:
$1,260
- - - - - - $3,900 - -
-
kWh
-
-
MMBtu
-
-
Tgal
$3,900
-
$
06: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$645
Cost:
$225
- - - - - - $645 - -
-
kWh
-
-
MMBtu
-
-
Tgal
$645
-
$
07: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$780
Cost:
$650
- - - - - - $780 - -
-
kWh
-
-
MMBtu
-
-
Tgal
$780
-
$
08: 3.4151 MINIMIZE WATER USAGE Savings:
$20,966
Cost:
$2,000
- - - - $20,966 748,800 - - -
-
kWh
-
-
MMBtu
$20,966
748,800
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$40,146
Cost:
$14,385
$281 6,741 $9,674 2,756 $20,966 748,800 $9,225 - $281
6,741
kWh
$9,674
2,756
MMBtu
$20,966
748,800
Tgal
$9,225
-
$
TOTAL IMPLEMENTED Savings:
$8,230
Cost:
$1,050
- - $7,450 2,122 - - $780 - -
-
kWh
$7,450
2,122
MMBtu
-
-
Tgal
$780
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $
Electricity Usage Fuel Oil #2 Water Disposal One-time Revenue or Avoided Cost Electricity Usage Fuel Oil #2 Water Disposal One-time Revenue or Avoided Cost