IAC logo
IAC Assessment: HO0227
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0227
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 2000
Principal Product Truck Equipment
NAICS n/a
SIC 3713 - Truck And Bus Bodies
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 330,830
Annual Production 7,000 Pieces
Production Hrs. Annual 2,080
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $86,489 2,134,525 kWh $0.04
Electricity Demand $80,370 9,414 kW-months/year $8.54
Electricity Fees $11,077 - $ -
LPG $92,127 11,033 MMBtu $8.35
TOTAL ENERGY COSTS $270,063
RECOMMENDED SAVINGS* $358,935 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,988
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees LPG One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees LPG One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,311
Cost:
-
$1,311 32,825 - - - - - - - - $1,311
32,825
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,704
Cost:
$1,408
$762 19,050 $942 110 - - - - - - $762
19,050
kWh
$942
110
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,582
Cost:
$60
$707 17,878 $875 103 - - - - - - $707
17,878
kWh
$875
103
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,607
Cost:
$1,200
$725 17,878 $882 103 - - - - - - $725
17,878
kWh
$882
103
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$31,378
Cost:
$800
$31,378 785,170 - - - - - - - - $31,378
785,170
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$11,189
Cost:
$21,600
$5,049 124,853 $6,140 719 - - - - - - $5,049
124,853
kWh
$6,140
719
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,044
Cost:
$1,400
$1,044 26,084 - - - - - - - - $1,044
26,084
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$6,919
Cost:
$20,000
- - - - $6,919 - - - - - -
-
kWh
-
-
kW-months/year
$6,919
-
$
-
-
MMBtu
-
-
$
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,937
Cost:
$11,490
- - - - $9,937 - - - - - -
-
kWh
-
-
kW-months/year
$9,937
-
$
-
-
MMBtu
-
-
$
10: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,493
Cost:
-
$1,493 16,706 - - - - - - - - $1,493
16,706
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
11: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,235
Cost:
-
$2,235 56,272 - - - - - - - - $2,235
56,272
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
12: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$2,714
Cost:
-
- - - - - - $2,714 325 - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,714
325
MMBtu
-
-
$
13: 4.4240 IMPROVE SPACE COMFORT CONDITIONING Savings:
$1,560
Cost:
$600
- - - - - - - - $1,560 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,560
-
$
14: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$20,800
Cost:
$5,000
- - - - - - - - $20,800 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$20,800
-
$
15: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$4,666
Cost:
$500
- - - - - - - - $4,666 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$4,666
-
$
16: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$39,375
Cost:
$500
- - - - - - - - $39,375 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$39,375
-
$
17: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$6,240
Cost:
$500
- - - - - - - - $6,240 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$6,240
-
$
18: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$32,340
Cost:
-
- - - - - - - - $32,340 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$32,340
-
$
19: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$6,836
Cost:
$600
- - - - - - - - $6,836 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$6,836
-
$
20: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$1,440
Cost:
$968
- - - - - - - - $1,440 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,440
-
$
21: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,000
Cost:
$250
- - - - - - - - $2,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,000
-
$
22: 4.5110 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$153,465
Cost:
$300,000
- - - - - - - - $153,465 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$153,465
-
$
23: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$17,100
Cost:
$6,500
- - - - - - - - $17,100 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$17,100
-
$
TOTAL RECOMMENDED Savings:
$358,935
Cost:
$373,376
$44,704 1,096,716 $8,839 1,035 $16,856 - $2,714 325 $285,822 - $44,704
1,096,716
kWh
$8,839
1,035
kW-months/year
$16,856
-
$
$2,714
325
MMBtu
$285,822
-
$
TOTAL IMPLEMENTED Savings:
$51,988
Cost:
$4,218
$5,317 112,543 $1,817 213 - - $2,714 325 $42,140 - $5,317
112,543
kWh
$1,817
213
kW-months/year
-
-
$
$2,714
325
MMBtu
$42,140
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees LPG One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees LPG One-time Revenue or Avoided Cost