Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Hofstra Univ. |
---|---|
Assessment Year | 2000 |
Principal Product | Decorative Ornamental Figurines |
NAICS | n/a |
SIC | 3999 - Manufacturing Industries, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 180 |
Plant Area (Sq.Ft.) | 90,000 |
Annual Production | 650,000 Pieces |
Production Hrs. Annual | 2,805 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $44,637 | 1,033,705 | kWh | $0.04 |
Electricity Demand | $66,560 | 3,333 | kW-months/year | $19.97 |
Electricity Fees | $1,528 | - | $ | - |
Natural Gas | $9,848 | 1,272 | MMBtu | $7.74 |
TOTAL ENERGY COSTS | $122,573 | |||
RECOMMENDED SAVINGS* | $441,316 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $3,159 Cost: $2,800 |
$3,159 | 22,567 | - | - | - | - |
$3,159 22,567 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $402 Cost: $15 |
$135 | 3,224 | $267 | 13 | - | - |
$135 3,224 kWh |
$267 13 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $332 Cost: $400 |
$111 | 2,638 | $221 | 11 | - | - |
$111 2,638 kWh |
$221 11 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,167 Cost: $120 |
$1,167 | 9,086 | - | - | - | - |
$1,167 9,086 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $4,374 Cost: $20,000 |
- | - | - | - | $4,374 | - |
- - kWh |
- - kW-months/year |
$4,374 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $985 Cost: $250 |
- | - | - | - | $985 | - |
- - kWh |
- - kW-months/year |
$985 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL |
Savings: $7,650 Cost: $5,000 |
- | - | - | - | $7,650 | - |
- - kWh |
- - kW-months/year |
$7,650 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES |
Savings: $1,912 Cost: $5,880 |
- | - | - | - | $1,912 | - |
- - kWh |
- - kW-months/year |
$1,912 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $1,160 Cost: $335 |
- | - | - | - | $1,160 | - |
- - kWh |
- - kW-months/year |
$1,160 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS |
Savings: $419,000 Cost: $30,000 |
- | - | - | - | $419,000 | - |
- - kWh |
- - kW-months/year |
$419,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.4155 METER WASTE WATER |
Savings: $1,000 Cost: $250 |
- | - | - | - | $1,000 | - |
- - kWh |
- - kW-months/year |
$1,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $175 Cost: $500 |
- | - | - | - | $175 | - |
- - kWh |
- - kW-months/year |
$175 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $441,316 Cost: $65,550 |
$4,572 | 37,515 | $488 | 24 | $436,256 | - | $4,572 37,515 kWh |
$488 24 kW-months/year |
$436,256 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost |