Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 1999 |
Principal Product | Parts Washers |
NAICS | n/a |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 56,400 |
Annual Production | 25,000 Pounds |
Production Hrs. Annual | 5,500 |
Location (State) | MN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $51,504 | 764,361 | kWh | $0.07 |
Electricity Demand | $24,369 | 2,604 | kW-months/year | $9.36 |
Natural Gas | $44,005 | 7,397 | MMBtu | $5.95 |
TOTAL ENERGY COSTS | $123,367 | |||
RECOMMENDED SAVINGS* | $244,230 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $204,905 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Gaseous Waste | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Gaseous Waste | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $13,656 Cost: $1,064 |
$8,297 | 274,619 | $5,359 | 576 | - | - | - | - | - | - | - | - |
$8,297 274,619 kWh |
$5,359 576 kW-months/year |
- - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $561 Cost: $931 |
$561 | 18,757 | - | - | - | - | - | - | - | - | - | - |
$561 18,757 kWh |
- - kW-months/year |
- - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $391 Cost: $33 |
$212 | 7,034 | $179 | 19 | - | - | - | - | - | - | - | - |
$212 7,034 kWh |
$179 19 kW-months/year |
- - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $421 Cost: $226 |
$245 | 8,206 | $176 | 22 | - | - | - | - | - | - | - | - |
$245 8,206 kWh |
$176 22 kW-months/year |
- - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT |
Savings: $5,097 Cost: $3,584 |
- | - | - | - | $5,097 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,097 - lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
Savings: $3,600 Cost: $900 |
- | - | - | - | - | - | $3,600 | 4,245 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$3,600 4,245 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $2,900 Cost: $3,000 |
- | - | - | - | $2,900 | 104,000 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,900 104,000 lb |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.451 ADD ADDITIONAL PRODUCTION SHIFT |
Savings: $199,932 Cost: $425,000 |
$1,932 | 63,892 | - | - | - | - | - | - | $198,000 | - | - | - |
$1,932 63,892 kWh |
- - kW-months/year |
- - lb |
- - lb |
$198,000 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL |
Savings: $17,160 Cost: $25,792 |
- | - | - | - | - | - | - | - | $17,160 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
- - lb |
$17,160 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE |
Savings: $512 Cost: $1,200 |
- | - | - | - | - | - | - | - | - | - | $512 | - |
- - kWh |
- - kW-months/year |
- - lb |
- - lb |
- - $ |
$512 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $244,230 Cost: $461,730 |
$11,247 | 372,508 | $5,714 | 617 | $7,997 | 104,000 | $3,600 | 4,245 | $215,160 | - | $512 | - | $11,247 372,508 kWh |
$5,714 617 kW-months/year |
$7,997 104,000 lb |
$3,600 4,245 lb |
$215,160 - $ |
$512 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $204,905 Cost: $427,090 |
$2,950 | 97,889 | $355 | 41 | - | - | $3,600 | 4,245 | $198,000 | - | - | - | $2,950 97,889 kWh |
$355 41 kW-months/year |
- - lb |
$3,600 4,245 lb |
$198,000 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Gaseous Waste | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Gaseous Waste | Personnel Changes | Ancillary Material Cost |