IAC logo
IAC Assessment: IA0222
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0222
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1999
Principal Product Parts Washers
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 56,400
Annual Production 25,000 Pounds
Production Hrs. Annual 5,500
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,504 764,361 kWh $0.07
Electricity Demand $24,369 2,604 kW-months/year $9.36
Natural Gas $44,005 7,397 MMBtu $5.95
TOTAL ENERGY COSTS $123,367
RECOMMENDED SAVINGS* $244,230 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $204,905
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Gaseous Waste Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Gaseous Waste Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ lb $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$13,656
Cost:
$1,064
$8,297 274,619 $5,359 576 - - - - - - - - $8,297
274,619
kWh
$5,359
576
kW-months/year
-
-
lb
-
-
lb
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$561
Cost:
$931
$561 18,757 - - - - - - - - - - $561
18,757
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$391
Cost:
$33
$212 7,034 $179 19 - - - - - - - - $212
7,034
kWh
$179
19
kW-months/year
-
-
lb
-
-
lb
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$421
Cost:
$226
$245 8,206 $176 22 - - - - - - - - $245
8,206
kWh
$176
22
kW-months/year
-
-
lb
-
-
lb
-
-
$
-
-
$
05: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$5,097
Cost:
$3,584
- - - - $5,097 - - - - - - - -
-
kWh
-
-
kW-months/year
$5,097
-
lb
-
-
lb
-
-
$
-
-
$
06: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$3,600
Cost:
$900
- - - - - - $3,600 4,245 - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$3,600
4,245
lb
-
-
$
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,900
Cost:
$3,000
- - - - $2,900 104,000 - - - - - - -
-
kWh
-
-
kW-months/year
$2,900
104,000
lb
-
-
lb
-
-
$
-
-
$
08: 4.4510 ADD ADDITIONAL PRODUCTION SHIFT Savings:
$199,932
Cost:
$425,000
$1,932 63,892 - - - - - - $198,000 - - - $1,932
63,892
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
$198,000
-
$
-
-
$
09: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$17,160
Cost:
$25,792
- - - - - - - - $17,160 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
$17,160
-
$
-
-
$
10: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$512
Cost:
$1,200
- - - - - - - - - - $512 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
-
-
$
$512
-
$
TOTAL RECOMMENDED Savings:
$244,230
Cost:
$461,730
$11,247 372,508 $5,714 617 $7,997 104,000 $3,600 4,245 $215,160 - $512 - $11,247
372,508
kWh
$5,714
617
kW-months/year
$7,997
104,000
lb
$3,600
4,245
lb
$215,160
-
$
$512
-
$
TOTAL IMPLEMENTED Savings:
$204,905
Cost:
$427,090
$2,950 97,889 $355 41 - - $3,600 4,245 $198,000 - - - $2,950
97,889
kWh
$355
41
kW-months/year
-
-
lb
$3,600
4,245
lb
$198,000
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Gaseous Waste Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Gaseous Waste Personnel Changes Ancillary Material Cost