IAC Assessment: IA0259
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0259
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2000
Principal Product electronic scoreboards
NAICS n/a
SIC 3669 - Communications Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 91
Plant Area (Sq.Ft.) 71,670
Annual Production 2,800 Pieces
Production Hrs. Annual 2,210
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $33,815 706,624 kWh $0.05
Electricity Demand $14,118 2,400 kW-months/year $5.88
Natural Gas $16,118 3,300 MMBtu $4.88
TOTAL ENERGY COSTS $64,797
RECOMMENDED SAVINGS* $200,241 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,460
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Water Consumption Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Water Consumption
$ kWh $ kW-months/year $ gal $ lb $ $ $ Tgal
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,066
Cost:
$100
$3,019 64,185 $2,047 348 - - - - - - - - $3,019
64,185
kWh
$2,047
348
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$530
Cost:
$1,073
$530 11,137 - - - - - - - - - - $530
11,137
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,277
Cost:
$139
$759 16,120 $518 88 - - - - - - - - $759
16,120
kWh
$518
88
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$248
Cost:
$58
$147 3,224 $101 18 - - - - - - - - $147
3,224
kWh
$101
18
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$120
Cost:
$40
$73 1,465 $47 8 - - - - - - - - $73
1,465
kWh
$47
8
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
06: 3.5145 RECOVER AND REUSE SPENT ACID BATHS Savings:
$58,747
Cost:
$2,500
$(-388) (-8,206) $(-265) (-45) $59,400 1,188 - - - - - - $(-388)
(-8,206)
kWh
$(-265)
(-45)
kW-months/year
$59,400
1,188
gal
-
-
lb
-
-
$
-
-
Tgal
07: 3.4157 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING Savings:
$1,445
Cost:
$5,020
- - - - - - - - - - $1,445 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
$1,445
-
Tgal
08: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$208
Cost:
$30
- - - - - - $208 2,600 - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$208
2,600
lb
-
-
$
-
-
Tgal
09: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$132,600
Cost:
$250,000
- - - - - - - - $132,600 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$132,600
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$200,241
Cost:
$258,960
$4,140 87,925 $2,448 417 $59,400 1,188 $208 2,600 $132,600 - $1,445 - $4,140
87,925
kWh
$2,448
417
kW-months/year
$59,400
1,188
gal
$208
2,600
lb
$132,600
-
$
$1,445
-
Tgal
TOTAL IMPLEMENTED Savings:
$3,460
Cost:
$6,262
$1,289 27,257 $518 88 - - $208 2,600 - - $1,445 - $1,289
27,257
kWh
$518
88
kW-months/year
-
-
gal
$208
2,600
lb
-
-
$
$1,445
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ Tgal
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Water Consumption Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Water Consumption