IAC Assessment: IA0494
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2013
Principal Product Livestock food supplements
NAICS 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899 - Chemical Preparations, Nec
Sales $100,000,000-$500,000,000
# of Employees 190
Plant Area (Sq.Ft.) 193,000
Annual Production 90,000 Tons
Production Hrs. Annual 8,760
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $338,727 10,199,082 kWh $0.03
Electricity Demand $132,612 21,975 kW-months/year $6.03
Electricity Fees $56,149 - $ -
Natural Gas $217,897 46,594 MMBtu $4.68
TOTAL ENERGY COSTS $745,385
RECOMMENDED SAVINGS* $50,496 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,690
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,243
Cost:
$1,750
$1,243 37,582 - - - - - - $1,243
37,582
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$768
Cost:
$463
$615 18,571 $153 25 - - - - $615
18,571
kWh
$153
25
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,490
Cost:
$1,500
- - - - $4,490 959 - - -
-
kWh
-
-
kW-months/year
$4,490
959
MMBtu
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$37,210
Cost:
$18,000
- - - - - - $37,210 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$37,210
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$979
Cost:
$1,620
$979 29,577 - - - - - - $979
29,577
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$512
Cost:
$600
- - - - $512 109 - - -
-
kWh
-
-
kW-months/year
$512
109
MMBtu
-
-
$
07: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$1,710
Cost:
$5,400
- - - - - - $1,710 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,710
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,861
Cost:
$10,000
$2,291 69,204 $570 95 - - - - $2,291
69,204
kWh
$570
95
kW-months/year
-
-
MMBtu
-
-
$
09: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$724
Cost:
$1,000
- - - - $724 155 - - -
-
kWh
-
-
kW-months/year
$724
155
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$50,496
Cost:
$40,333
$5,128 154,934 $723 120 $5,726 1,223 $38,920 - $5,128
154,934
kWh
$723
120
kW-months/year
$5,726
1,223
MMBtu
$38,920
-
$
TOTAL IMPLEMENTED Savings:
$44,690
Cost:
$25,963
$615 18,571 $153 25 $5,002 1,069 $38,920 - $615
18,571
kWh
$153
25
kW-months/year
$5,002
1,069
MMBtu
$38,920
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes