IAC logo
IAC Assessment: IA0544
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0544
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2015
Principal Product Agricultural Equipment
NAICS 333111 - Farm Machinery and Equipment Manufacturing
SIC 3523 - Farm Machinery And Equipment
Sales $10,000,000-$50,000,000
# of Employees 448
Plant Area (Sq.Ft.) 368,000
Annual Production 400 Pieces
Production Hrs. Annual 3,600
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $64,531 1,887,069 kWh $0.03
Electricity Demand $21,239 4,428 kW-months/year $4.80
Natural Gas $10,397 1,837 MMBtu $5.66
TOTAL ENERGY COSTS $96,167
RECOMMENDED SAVINGS* $8,630 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,342
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,685
Cost:
$565
$2,308 62,901 $377 86 - - $2,308
62,901
kWh
$377
86
kW-months/year
-
-
MMBtu
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,538
Cost:
$12,000
- - - - $2,538 448 -
-
kWh
-
-
kW-months/year
$2,538
448
MMBtu
03: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$2,428
Cost:
$3,000
- - - - $2,428 429 -
-
kWh
-
-
kW-months/year
$2,428
429
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$462
Cost:
$278
$334 9,102 $128 29 - - $334
9,102
kWh
$128
29
kW-months/year
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$398
Cost:
$1,357
$398 10,839 - - - - $398
10,839
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$119
Cost:
$70
- - - - $119 21 -
-
kWh
-
-
kW-months/year
$119
21
MMBtu
TOTAL RECOMMENDED Savings:
$8,630
Cost:
$17,270
$3,040 82,842 $505 115 $5,085 898 $3,040
82,842
kWh
$505
115
kW-months/year
$5,085
898
MMBtu
TOTAL IMPLEMENTED Savings:
$5,342
Cost:
$12,635
$2,308 62,901 $377 86 $2,657 469 $2,308
62,901
kWh
$377
86
kW-months/year
$2,657
469
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas