IAC Assessment: IC0150
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0150
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2008
Principal Product Beer
NAICS 312120 - Breweries
SIC 2082 - Malt Beverages
Sales $5,000,000-$10,000,000
# of Employees 750
Plant Area (Sq.Ft.) 12,839,579
Annual Production 220,982 Thousand Gallons
Production Hrs. Annual 8,592
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,134,605 92,032,475 kWh $0.04
Electricity Demand $1,849,478 161,293 kW-months/year $11.47
Natural Gas $9,418,709 1,013,826 MMBtu $9.29
TOTAL ENERGY COSTS $18,575,022
RECOMMENDED SAVINGS* $795,696 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Water Consumption Electricity Usage Natural Gas Personnel Changes Water Consumption
$ kWh $ MMBtu $ $ $ Tgal
01: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$391,205
Cost:
$3,038,750
$2,014,113 32,960,071 $(-1,489,905) (-162,476) $(-131,848) - $(-1,155) - $2,014,113
32,960,071
kWh
$(-1,489,905)
(-162,476)
MMBtu
$(-131,848)
-
$
$(-1,155)
-
Tgal
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,054
Cost:
$2,900
- - $1,018 111 - - $36 - -
-
kWh
$1,018
111
MMBtu
-
-
$
$36
-
Tgal
03: 2.2164 TURN OFF STEAM TRACING DURING MILD WEATHER Savings:
$229
Cost:
$229
- - $229 25 - - - - -
-
kWh
$229
25
MMBtu
-
-
$
-
-
Tgal
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$26,630
Cost:
-
- - $26,630 2,904 - - - - -
-
kWh
$26,630
2,904
MMBtu
-
-
$
-
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$27,921
Cost:
$6,440
$27,921 620,464 - - - - - - $27,921
620,464
kWh
-
-
MMBtu
-
-
$
-
-
Tgal
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$21,400
Cost:
$8,021
- - $21,400 2,335 - - - - -
-
kWh
$21,400
2,335
MMBtu
-
-
$
-
-
Tgal
07: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$71,867
Cost:
$2,470
- - $67,888 7,403 - - $3,979 - -
-
kWh
$67,888
7,403
MMBtu
-
-
$
$3,979
-
Tgal
08: 2.9112 USE SOLAR HEAT TO HEAT WATER Savings:
$468
Cost:
$4,411
- - $468 51 - - - - -
-
kWh
$468
51
MMBtu
-
-
$
-
-
Tgal
09: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$8,494
Cost:
$3,000
- - $8,227 897 - - $267 - -
-
kWh
$8,227
897
MMBtu
-
-
$
$267
-
Tgal
10: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$246,428
Cost:
$26,100
- - $246,428 26,879 - - - - -
-
kWh
$246,428
26,879
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$795,696
Cost:
$3,092,321
$2,042,034 33,580,535 $(-1,117,617) (-121,871) $(-131,848) - $3,127 - $2,042,034
33,580,535
kWh
$(-1,117,617)
(-121,871)
MMBtu
$(-131,848)
-
$
$3,127
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ $ $ Tgal
Electricity Usage Natural Gas Personnel Changes Water Consumption Electricity Usage Natural Gas Personnel Changes Water Consumption