IAC logo
IAC Assessment: IC0284
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0284
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2023
Principal Product Commercial Lighting Fixtures
NAICS 335122 - Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing
SIC 3646 - Commercial Lighting Fixtures
Sales $50,000,000-$100,000,000
# of Employees 340
Plant Area (Sq.Ft.) 180,000
Annual Production 7,161,463 Units
Production Hrs. Annual 4,576
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $299,929 3,820,747 kWh $0.08
Electricity Fees $151,169 - $ -
Natural Gas $388,997 46,948 MMBtu $8.29
TOTAL ENERGY COSTS $840,095
RECOMMENDED SAVINGS* $357,887 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Primary Product Electricity Usage Natural Gas Primary Product
$ kWh $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,480
Cost:
$3,669
$6,480 82,029 - - - - $6,480
82,029
kWh
-
-
MMBtu
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,864
Cost:
-
$4,864 61,571 - - - - $4,864
61,571
kWh
-
-
MMBtu
-
-
$
03: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$445
Cost:
-
$445 5,628 - - - - $445
5,628
kWh
-
-
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$556
Cost:
$897
- - $556 67 - - -
-
kWh
$556
67
MMBtu
-
-
$
05: 2.5113 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING Savings:
$152,337
Cost:
$14,315
- - $152,337 18,354 - - -
-
kWh
$152,337
18,354
MMBtu
-
-
$
06: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$192,600
Cost:
$121,203
- - - - $192,600 - -
-
kWh
-
-
MMBtu
$192,600
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$415
Cost:
-
$415 5,256 - - - - $415
5,256
kWh
-
-
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$190
Cost:
$379
$190 2,406 - - - - $190
2,406
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$357,887
Cost:
$140,463
$12,394 156,891 $152,893 18,421 $192,600 - $12,394
156,891
kWh
$152,893
18,421
MMBtu
$192,600
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Primary Product Electricity Usage Natural Gas Primary Product