IAC logo
IAC Assessment: IC0325
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0325
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2025
Principal Product Electroless Nickel and Chrome Plating
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3399 - Primary Metal Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 30
Plant Area (Sq.Ft.) 25,735
Annual Production 9,000,000 Pieces
Production Hrs. Annual 2,600
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,348 866,449 kWh $0.06
Electricity Demand $23,185 2,034 kW-months/year $11.40
Electricity Fees $31,397 - $ -
Natural Gas $66,760 9,737 MMBtu $6.86
TOTAL ENERGY COSTS $170,690
RECOMMENDED SAVINGS* $76,098 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$34,094
Cost:
$58,119
$3,059 53,667 $2,827 248 $28,208 4,114 $3,059
53,667
kWh
$2,827
248
kW-months/year
$28,208
4,114
MMBtu
02: 2.3312 INSTALL EFFICIENT RECTIFIERS Savings:
$8,079
Cost:
$8,129
$4,194 73,895 $3,885 341 - - $4,194
73,895
kWh
$3,885
341
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,138
Cost:
$5,309
$13,430 235,606 $(-292) (-26) - - $13,430
235,606
kWh
$(-292)
(-26)
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,318
Cost:
$7,240
$7,318 128,386 - - - - $7,318
128,386
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$4,795
Cost:
$3,414
- - - - $4,795 699 -
-
kWh
-
-
kW-months/year
$4,795
699
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,350
Cost:
$246
$1,222 21,438 $1,128 99 - - $1,222
21,438
kWh
$1,128
99
kW-months/year
-
-
MMBtu
07: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$2,149
Cost:
$5,256
- - - - $2,149 313 -
-
kWh
-
-
kW-months/year
$2,149
313
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,716
Cost:
-
$915 16,049 $802 70 - - $915
16,049
kWh
$802
70
kW-months/year
-
-
MMBtu
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,137
Cost:
-
$591 10,373 $545 48 - - $591
10,373
kWh
$545
48
kW-months/year
-
-
MMBtu
10: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,175
Cost:
$2,940
$760 13,338 $414 36 - - $760
13,338
kWh
$414
36
kW-months/year
-
-
MMBtu
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$149
Cost:
$144
$79 1,388 $69 6 - - $79
1,388
kWh
$69
6
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$76,098
Cost:
$90,797
$31,568 554,140 $9,379 823 $35,151 5,126 $31,568
554,140
kWh
$9,379
823
kW-months/year
$35,151
5,126
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas