IAC Assessment: IP0021
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IP0021
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Indiana University-Purdue University
Assessment Year 2014
Principal Product Beer
NAICS 312120 - Breweries
SIC 2083 - Malt
Sales $1,000,000-$5,000,000
# of Employees 21
Plant Area (Sq.Ft.) 40,000
Annual Production 4,324 Thousand Gallons
Production Hrs. Annual 4,050
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $10,445 620,664 kWh $0.02
Electricity Demand $23,839 1,696 kW-months/year $14.06
Electricity Fees $48,138 - $ -
Natural Gas $31,474 4,009 MMBtu $7.85
TOTAL ENERGY COSTS $140,446
RECOMMENDED SAVINGS* $17,391 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,439
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Gaseous Waste Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Gaseous Waste Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$4,267
Cost:
-
- - - - - - - - - - $4,267 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$4,267
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,655
Cost:
-
- - - - - - $2,655 17,700 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,655
17,700
lb
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$513
Cost:
-
$188 5,144 $325 15 - - - - - - - - $188
5,144
kWh
$325
15
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,181
Cost:
-
- - - - - - - - - - $1,181 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$1,181
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,336
Cost:
-
$1,225 33,461 $2,111 99 - - - - - - - - $1,225
33,461
kWh
$2,111
99
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$222
Cost:
$118
$222 6,067 - - - - - - - - - - $222
6,067
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$349
Cost:
$231
- - - - $349 44 - - - - - - -
-
kWh
-
-
kW-months/year
$349
44
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,868
Cost:
$5,580
$476 13,000 $(-608) (-29) - - - - $5,000 - - - $476
13,000
kWh
$(-608)
(-29)
kW-months/year
-
-
MMBtu
-
-
lb
$5,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$17,391
Cost:
$5,929
$2,111 57,672 $1,828 86 $349 44 $2,655 17,700 $5,000 - $5,448 - $2,111
57,672
kWh
$1,828
86
kW-months/year
$349
44
MMBtu
$2,655
17,700
lb
$5,000
-
$
$5,448
-
$
TOTAL IMPLEMENTED Savings:
$9,439
Cost:
$5,698
$886 24,211 $(-283) (-13) - - $2,655 17,700 $5,000 - $1,181 - $886
24,211
kWh
$(-283)
(-13)
kW-months/year
-
-
MMBtu
$2,655
17,700
lb
$5,000
-
$
$1,181
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Gaseous Waste Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Gaseous Waste Personnel Changes Administrative Changes