IAC Assessment: IP0085
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Indiana University-Purdue University
Assessment Year 2017
Principal Product Car Batteries
NAICS 335912 - Primary Battery Manufacturing
SIC 3692 - Primary Batteries, Dry And Wet
Sales $100,000,000-$500,000,000
# of Employees 130
Plant Area (Sq.Ft.) 146,000
Annual Production 5,501,414 Units
Production Hrs. Annual 8,760
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,242,075 23,611,657 kWh $0.05
Electricity Demand $448,212 54,846 kW-months/year $8.17
Electricity Fees $2,052 - $ -
Natural Gas $193,363 34,560 MMBtu $5.59
TOTAL ENERGY COSTS $1,885,702
RECOMMENDED SAVINGS* $495,598 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$1,359
Cost:
-
$1,121 21,155 $238 29 - - - - $1,121
21,155
kWh
$238
29
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$1,244
Cost:
$6
- - - - $1,244 222 - - -
-
kWh
-
-
kW-months/year
$1,244
222
MMBtu
-
-
$
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$13,004
Cost:
$4
$10,730 182,224 $2,274 250 - - - - $10,730
182,224
kWh
$2,274
250
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,588
Cost:
$155
$2,135 40,291 $453 55 - - - - $2,135
40,291
kWh
$453
55
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,570
Cost:
$963
$4,067 76,737 $503 61 - - - - $4,067
76,737
kWh
$503
61
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$5,250
Cost:
$2,002
$4,332 81,732 $918 112 - - - - $4,332
81,732
kWh
$918
112
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$18,232
Cost:
$10,662
$18,232 344,005 - - - - - - $18,232
344,005
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$989
Cost:
$804
$989 18,659 - - - - - - $989
18,659
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$448,362
Cost:
$2,150,000
$876,155 16,531,225 $191,373 23,338 $68,109 14,160 $(-687,275) - $876,155
16,531,225
kWh
$191,373
23,338
kW-months/year
$68,109
14,160
MMBtu
$(-687,275)
-
$
TOTAL RECOMMENDED Savings:
$495,598
Cost:
$2,164,596
$917,761 17,296,028 $195,759 23,845 $69,353 14,382 $(-687,275) - $917,761
17,296,028
kWh
$195,759
23,845
kW-months/year
$69,353
14,382
MMBtu
$(-687,275)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost