Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Indiana University-Purdue University |
---|---|
Assessment Year | 2017 |
Principal Product | Car Batteries |
NAICS | 335912 - Primary Battery Manufacturing |
SIC | 3692 - Primary Batteries, Dry And Wet |
Sales | $100,000,000-$500,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 146,000 |
Annual Production | 5,501,414 Units |
Production Hrs. Annual | 8,760 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,242,075 | 23,611,657 | kWh | $0.05 |
Electricity Demand | $448,212 | 54,846 | kW-months/year | $8.17 |
Electricity Fees | $2,052 | - | $ | - |
Natural Gas | $193,363 | 34,560 | MMBtu | $5.59 |
TOTAL ENERGY COSTS | $1,885,702 | |||
RECOMMENDED SAVINGS* | $495,598 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $1,359 Cost: - |
$1,121 | 21,155 | $238 | 29 | - | - | - | - |
$1,121 21,155 kWh |
$238 29 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR |
Savings: $1,244 Cost: $6 |
- | - | - | - | $1,244 | 222 | - | - |
- - kWh |
- - kW-months/year |
$1,244 222 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $13,004 Cost: $4 |
$10,730 | 182,224 | $2,274 | 250 | - | - | - | - |
$10,730 182,224 kWh |
$2,274 250 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,588 Cost: $155 |
$2,135 | 40,291 | $453 | 55 | - | - | - | - |
$2,135 40,291 kWh |
$453 55 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $4,570 Cost: $963 |
$4,067 | 76,737 | $503 | 61 | - | - | - | - |
$4,067 76,737 kWh |
$503 61 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS |
Savings: $5,250 Cost: $2,002 |
$4,332 | 81,732 | $918 | 112 | - | - | - | - |
$4,332 81,732 kWh |
$918 112 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $18,232 Cost: $10,662 |
$18,232 | 344,005 | - | - | - | - | - | - |
$18,232 344,005 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $989 Cost: $804 |
$989 | 18,659 | - | - | - | - | - | - |
$989 18,659 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $448,362 Cost: $2,150,000 |
$876,155 | 16,531,225 | $191,373 | 23,338 | $68,109 | 14,160 | $(-687,275) | - |
$876,155 16,531,225 kWh |
$191,373 23,338 kW-months/year |
$68,109 14,160 MMBtu |
$(-687,275) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $495,598 Cost: $2,164,596 |
$917,761 | 17,296,028 | $195,759 | 23,845 | $69,353 | 14,382 | $(-687,275) | - | $917,761 17,296,028 kWh |
$195,759 23,845 kW-months/year |
$69,353 14,382 MMBtu |
$(-687,275) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost |