Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Indiana University-Purdue University |
---|---|
Assessment Year | 2019 |
Principal Product | Natural Cheese |
NAICS | 311513 - Cheese Manufacturing |
SIC | 2022 - Cheese, Natural And Processed |
Sales | $100,000,000-$500,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 173,720 |
Annual Production | 115,000,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $330,343 | 11,264,400 | kWh | $0.03 |
Electricity Demand | $457,159 | 19,545 | kW-months/year | $23.39 |
Electricity Fees | $5,685 | - | $ | - |
Natural Gas | $21,868 | 19,808 | MMBtu | $1.10 |
TOTAL ENERGY COSTS | $815,055 | |||
RECOMMENDED SAVINGS* | $13,884 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,110 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,774 Cost: $150 |
$1,804 | 61,500 | $1,970 | 84 | - | - | - | - |
$1,804 61,500 kWh |
$1,970 84 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,180 Cost: $354 |
$2,180 | 74,340 | - | - | - | - | - | - |
$2,180 74,340 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $932 Cost: $315 |
$488 | 16,632 | $444 | 19 | - | - | - | - |
$488 16,632 kWh |
$444 19 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $908 Cost: $1,344 |
$434 | 14,804 | $474 | 20 | - | - | - | - |
$434 14,804 kWh |
$474 20 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $269 Cost: $500 |
$126 | 4,294 | $143 | 6 | - | - | - | - |
$126 4,294 kWh |
$143 6 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $3,324 Cost: $8,560 |
$1,971 | 67,200 | $2,807 | 120 | $(-1,454) | (-1,310) | - | - |
$1,971 67,200 kWh |
$2,807 120 kW-months/year |
$(-1,454) (-1,310) MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN |
Savings: $2,364 Cost: $6,720 |
- | - | - | - | $914 | 823 | $1,450 | 254,327 |
- - kWh |
- - kW-months/year |
$914 823 MMBtu |
$1,450 254,327 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $133 Cost: $390 |
$63 | 2,137 | - | - | $70 | 63 | - | - |
$63 2,137 kWh |
- - kW-months/year |
$70 63 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $13,884 Cost: $18,333 |
$7,066 | 240,907 | $5,838 | 250 | $(-470) | (-424) | $1,450 | 254,327 | $7,066 240,907 kWh |
$5,838 250 kW-months/year |
$(-470) (-424) MMBtu |
$1,450 254,327 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,110 Cost: $18,183 |
$5,262 | 179,407 | $3,868 | 165 | $(-470) | (-424) | $1,450 | 254,327 | $5,262 179,407 kWh |
$3,868 165 kW-months/year |
$(-470) (-424) MMBtu |
$1,450 254,327 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||