IAC logo
IAC Assessment: IP0150
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IP0150
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Indiana University-Purdue University
Assessment Year 2021
Principal Product automotive parts
NAICS 336111 - Automobile Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 59
Plant Area (Sq.Ft.) 112,000
Annual Production 7,153,972 Pieces
Production Hrs. Annual 2,465
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $37,096 631,220 kWh $0.06
Electricity Demand $18,996 1,900 kW-months/year $10.00
Electricity Fees $4,361 - $ -
Natural Gas $120,066 24,436 MMBtu $4.91
TOTAL ENERGY COSTS $180,519
RECOMMENDED SAVINGS* $3,089 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,089
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$952
Cost:
-
$772 13,140 $180 18 - - $772
13,140
kWh
$180
18
kW-months/year
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$702
Cost:
$150
$389 6,620 $313 31 - - $389
6,620
kWh
$313
31
kW-months/year
-
-
MMBtu
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$357
Cost:
$9
$63 1,065 - - $294 60 $63
1,065
kWh
-
-
kW-months/year
$294
60
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$423
Cost:
$42
$423 7,204 - - - - $423
7,204
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$654
Cost:
$1,559
$669 11,389 $(-15) (-2) - - $669
11,389
kWh
$(-15)
(-2)
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$3,089
Cost:
$1,760
$2,316 39,418 $478 48 $294 60 $2,316
39,418
kWh
$478
48
kW-months/year
$294
60
MMBtu
TOTAL IMPLEMENTED Savings:
$3,089
Cost:
$1,760
$2,316 39,418 $478 48 $294 60 $2,316
39,418
kWh
$478
48
kW-months/year
$294
60
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas