Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Indiana University-Purdue University |
---|---|
Assessment Year | 2023 |
Principal Product | Plastics |
NAICS | 423930 - Recyclable Material Merchant Wholesalers |
SIC | 2821 - Plastics Materials And Resins |
Sales | $1,000,000-$5,000,000 |
# of Employees | 12 |
Plant Area (Sq.Ft.) | 40,000 |
Annual Production | 7,000,000 Pounds |
Production Hrs. Annual | 5,200 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $109,277 | 1,058,400 | kWh | $0.10 |
Electricity Fees | $8,061 | - | $ | - |
Natural Gas | $8,589 | 921 | MMBtu | $9.33 |
TOTAL ENERGY COSTS | $125,926 | |||
RECOMMENDED SAVINGS* | $6,455 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $465 Cost: $18 |
$465 | 4,516 | - | - |
$465 4,516 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $4,823 Cost: $239 |
$4,823 | 46,822 | - | - |
$4,823 46,822 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $136 Cost: $95 |
$36 | 354 | $100 | 11 |
$36 354 kWh |
$100 11 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2311 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS |
Savings: $1,031 Cost: $6,735 |
- | - | $1,031 | 111 |
- - kWh |
$1,031 111 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $6,455 Cost: $7,087 |
$5,324 | 51,692 | $1,131 | 121 | $5,324 51,692 kWh |
$1,131 121 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - - kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||