IAC logo
IAC Assessment: IP0206
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IP0206
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Indiana University-Purdue University
Assessment Year 2024
Principal Product Stationary Batteries
NAICS 335911 - Storage Battery Manufacturing
SIC 3691 - Storage Batteries
Sales $50,000,000-$100,000,000
# of Employees 180
Plant Area (Sq.Ft.) 300,000
Annual Production 48,000 Pieces
Production Hrs. Annual 2,080
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $597,972 11,983,005 kWh $0.05
Electricity Demand $457,742 22,476 kW-months/year $20.37
Electricity Fees $1,898 - $ -
Natural Gas $378,724 73,252 MMBtu $5.17
TOTAL ENERGY COSTS $1,436,336
RECOMMENDED SAVINGS* $43,525 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,948
Cost:
$83
$1,178 23,555 $2,770 136 - - $1,178
23,555
kWh
$2,770
136
kW-months/year
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,530
Cost:
$714
$1,352 27,040 $3,178 156 - - $1,352
27,040
kWh
$3,178
156
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$31,184
Cost:
$17,042
$9,307 186,130 $21,877 1,074 - - $9,307
186,130
kWh
$21,877
1,074
kW-months/year
-
-
MMBtu
04: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$719
Cost:
$419
- - - - $719 139 -
-
kWh
-
-
kW-months/year
$719
139
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,174
Cost:
$877
$1,174 23,489 - - - - $1,174
23,489
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$1,970
Cost:
$4,748
- - - - $1,970 381 -
-
kWh
-
-
kW-months/year
$1,970
381
MMBtu
TOTAL RECOMMENDED Savings:
$43,525
Cost:
$23,883
$13,011 260,214 $27,825 1,366 $2,689 520 $13,011
260,214
kWh
$27,825
1,366
kW-months/year
$2,689
520
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas