IAC logo
IAC Assessment: KG0097
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0097
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1997
Principal Product Party Ice.
NAICS n/a
SIC 2097 - Manufactured Ice
Sales $5,000,000-$10,000,000
# of Employees 80
Plant Area (Sq.Ft.) 11,600
Annual Production 119,800,000 Pounds
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,125 3,138,335 kWh $0.03
Electricity Demand $38,053 5,656 kW-months/year $6.73
Electricity Fees $1,560 - $ -
TOTAL ENERGY COSTS $166,853
RECOMMENDED SAVINGS* $727,959 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Water Disposal Primary Product Electricity Usage Water Disposal Primary Product
$ kWh $ Tgal $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,522
Cost:
$5,150
$1,522 49,238 - - - - $1,522
49,238
kWh
-
-
Tgal
-
-
$
02: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$8,416
Cost:
$8,894
$8,416 271,395 - - - - $8,416
271,395
kWh
-
-
Tgal
-
-
$
03: 3.7221 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL Savings:
$90,970
Cost:
$800
- - $90,970 1,294,290 - - -
-
kWh
$90,970
1,294,290
Tgal
-
-
$
04: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$596,163
Cost:
$8,894
- - - - $596,163 - -
-
kWh
-
-
Tgal
$596,163
-
$
05: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$30,888
Cost:
$43,000
- - - - $30,888 - -
-
kWh
-
-
Tgal
$30,888
-
$
TOTAL RECOMMENDED Savings:
$727,959
Cost:
$66,738
$9,938 320,633 $90,970 1,294,290 $627,051 - $9,938
320,633
kWh
$90,970
1,294,290
Tgal
$627,051
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ Tgal $ $
Electricity Usage Water Disposal Primary Product Electricity Usage Water Disposal Primary Product