Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, Kingsville |
---|---|
Assessment Year | 1997 |
Principal Product | Party Ice. |
NAICS | n/a |
SIC | 2097 - Manufactured Ice |
Sales | $5,000,000-$10,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 11,600 |
Annual Production | 119,800,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $100,125 | 3,138,335 | kWh | $0.03 |
Electricity Demand | $38,053 | 5,656 | kW-months/year | $6.73 |
Electricity Fees | $1,560 | - | $ | - |
TOTAL ENERGY COSTS | $166,853 | |||
RECOMMENDED SAVINGS* | $727,959 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Water Disposal | Primary Product | Electricity Usage | Water Disposal | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,522 Cost: $5,150 |
$1,522 | 49,238 | - | - | - | - |
$1,522 49,238 kWh |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE |
Savings: $8,416 Cost: $8,894 |
$8,416 | 271,395 | - | - | - | - |
$8,416 271,395 kWh |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.7221 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL |
Savings: $90,970 Cost: $800 |
- | - | $90,970 | 1,294,290 | - | - |
- - kWh |
$90,970 1,294,290 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $596,163 Cost: $8,894 |
- | - | - | - | $596,163 | - |
- - kWh |
- - Tgal |
$596,163 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $30,888 Cost: $43,000 |
- | - | - | - | $30,888 | - |
- - kWh |
- - Tgal |
$30,888 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $727,959 Cost: $66,738 |
$9,938 | 320,633 | $90,970 | 1,294,290 | $627,051 | - | $9,938 320,633 kWh |
$90,970 1,294,290 Tgal |
$627,051 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Water Disposal | Primary Product | Electricity Usage | Water Disposal | Primary Product |