IAC logo
IAC Assessment: KG0099
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KG0099
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1997
Principal Product Kitchen and bath cabinets
NAICS n/a
SIC 2434 - Wood Kitchen Cabinets
Sales $100,000,000-$500,000,000
# of Employees 670
Plant Area (Sq.Ft.) 329,000
Annual Production 4,000 Pieces
Production Hrs. Annual 6,240
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $165,767 4,574,736 kWh $0.04
Electricity Demand $93,653 17,522 kW-months/year $5.34
Electricity Fees $2,845 - $ -
TOTAL ENERGY COSTS $646,387
RECOMMENDED SAVINGS* $80,272 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ lb $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,849
Cost:
$16,900
$8,849 245,897 - - - - - - $8,849
245,897
kWh
-
-
kW-months/year
-
-
lb
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,752
Cost:
-
$3,567 99,062 $1,185 190 - - - - $3,567
99,062
kWh
$1,185
190
kW-months/year
-
-
lb
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,683
Cost:
-
$2,765 76,788 $918 148 - - - - $2,765
76,788
kWh
$918
148
kW-months/year
-
-
lb
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$808
Cost:
$450
$808 22,567 - - - - - - $808
22,567
kWh
-
-
kW-months/year
-
-
lb
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$5,200
Cost:
-
- - - - $5,200 20,800 - - -
-
kWh
-
-
kW-months/year
$5,200
20,800
lb
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$4,580
Cost:
$7,950
- - - - $4,580 40,000 - - -
-
kWh
-
-
kW-months/year
$4,580
40,000
lb
-
-
$
07: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$1,440
Cost:
-
- - - - $1,440 80,000 - - -
-
kWh
-
-
kW-months/year
$1,440
80,000
lb
-
-
$
08: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$50,960
Cost:
$25,500
- - - - - - $50,960 - -
-
kWh
-
-
kW-months/year
-
-
lb
$50,960
-
$
TOTAL RECOMMENDED Savings:
$80,272
Cost:
$50,800
$15,989 444,314 $2,103 338 $11,220 140,800 $50,960 - $15,989
444,314
kWh
$2,103
338
kW-months/year
$11,220
140,800
lb
$50,960
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product