IAC logo
IAC Assessment: KU0152
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0152
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1985
Principal Product AVIATION ELECTRONICS
NAICS n/a
SIC 3699 - Electrical Equipment & Supplies, Nec
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 12,000 Pieces
Production Hrs. Annual 4,250
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $103,448 1,446,952 kWh $0.07
Natural Gas $7,088 1,567 MMBtu $4.52
TOTAL ENERGY COSTS $110,536
RECOMMENDED SAVINGS* $16,637 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,137
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,790
Cost:
$1,100
$3,790 53,048 - - $3,790
53,048
kWh
-
-
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,286
Cost:
$1,500
$4,502 63,013 $(-1,216) (-269) $4,502
63,013
kWh
$(-1,216)
(-269)
MMBtu
03: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$2,973
Cost:
$2,000
$2,973 41,618 - - $2,973
41,618
kWh
-
-
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,676
Cost:
$149
$796 11,137 $1,880 416 $796
11,137
kWh
$1,880
416
MMBtu
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$859
Cost:
-
$859 12,016 - - $859
12,016
kWh
-
-
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,085
Cost:
$2,160
$1,487 20,809 $(-402) (-89) $1,487
20,809
kWh
$(-402)
(-89)
MMBtu
07: 2.7314 REDUCE VENTILATION AIR Savings:
$877
Cost:
$100
- - $877 194 -
-
kWh
$877
194
MMBtu
08: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$176
Cost:
$600
- - $176 39 -
-
kWh
$176
39
MMBtu
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$155
Cost:
$280
$209 2,931 $(-54) (-12) $209
2,931
kWh
$(-54)
(-12)
MMBtu
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$129
Cost:
$113
$147 2,052 $(-18) (-4) $147
2,052
kWh
$(-18)
(-4)
MMBtu
11: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$233
Cost:
$14
$21 293 $212 47 $21
293
kWh
$212
47
MMBtu
12: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$189
Cost:
$20
$189 2,638 - - $189
2,638
kWh
-
-
MMBtu
13: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$209
Cost:
-
$209 2,931 - - $209
2,931
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$16,637
Cost:
$8,036
$15,182 212,486 $1,455 322 $15,182
212,486
kWh
$1,455
322
MMBtu
TOTAL IMPLEMENTED Savings:
$12,137
Cost:
$4,263
$9,046 126,612 $3,091 684 $9,046
126,612
kWh
$3,091
684
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas