IAC Assessment: KU0204
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0204
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1986
Principal Product WIRE HANGERS
NAICS n/a
SIC 2679 - Converted Paper Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 6,000 Tons
Production Hrs. Annual 4,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $111,011 1,466,882 kWh $0.08
Natural Gas $43,158 10,822 MMBtu $3.99
TOTAL ENERGY COSTS $154,169
RECOMMENDED SAVINGS* $65,532 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,750
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST Savings:
$50,936
Cost:
$300,000
$90,764 1,199,883 $(-39,828) (-9,750) - - $90,764
1,199,883
kWh
$(-39,828)
(-9,750)
MMBtu
-
-
$
02: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$8,720
Cost:
$3,000
- - $8,720 2,186 - - -
-
kWh
$8,720
2,186
MMBtu
-
-
$
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$2,017
Cost:
$1,600
$2,017 26,671 - - - - $2,017
26,671
kWh
-
-
MMBtu
-
-
$
04: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$1,220
Cost:
$700
- - $1,220 306 - - -
-
kWh
$1,220
306
MMBtu
-
-
$
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$715
Cost:
-
- - $715 100 - - -
-
kWh
$715
100
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$335
Cost:
-
- - $535 134 $(-200) - -
-
kWh
$535
134
MMBtu
$(-200)
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$732
Cost:
$30
$732 9,672 - - - - $732
9,672
kWh
-
-
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$576
Cost:
$50
$576 7,620 - - - - $576
7,620
kWh
-
-
MMBtu
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$155
Cost:
$100
$155 2,052 - - - - $155
2,052
kWh
-
-
MMBtu
-
-
$
10: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$126
Cost:
-
- - $126 32 - - -
-
kWh
$126
32
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$65,532
Cost:
$305,480
$94,244 1,245,898 $(-28,512) (-6,992) $(-200) - $94,244
1,245,898
kWh
$(-28,512)
(-6,992)
MMBtu
$(-200)
-
$
TOTAL IMPLEMENTED Savings:
$5,750
Cost:
$2,480
$3,480 46,015 $2,470 540 $(-200) - $3,480
46,015
kWh
$2,470
540
MMBtu
$(-200)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes